Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of prefabricated reinforced concrete wall in embedded steel rib bolt connection mode
A construction method of a prefabricated reinforced concrete wall in an embedded steel rib bolt connection mode is characterized by comprising the following steps of a, manufacturing an embedded bolt steel framework on the upper portion of a prefabricated reinforced concrete shear wall, b, manufacturing an embedded bolt steel framework on the lower portion of the prefabricated reinforced concrete shear wall, c, manufacturing the prefabricated reinforced concrete shear wall in the steel rib bolt connection mode, and d, constructing the prefabricated reinforced concrete shear wall in the embedded steel rib bolt connection mode. And d, the prefabricated reinforced concrete shear wall is installed in the upper and lower piece finished product embedded steel rib bolt connection mode. The construction method of the prefabricated reinforced concrete shear wall in the embedded steel rib bolt connection mode has the advantages that the high-strength bolts are adopted to guarantee the connection reliability of the upper shear wall and the lower shear wall, the connection quality of the upper and lower prefabricated reinforced concrete shear walls is guaranteed, and the installation speed is increased; and the prefabricated reinforced concrete shear wall node connection is more visible, and the hidden acceptance work is simpler and more reliable.
一种内嵌钢骨螺栓连接形式的预制钢筋混凝土墙施工方法,其特征在于包括以下步骤:a、制作预制钢筋混凝土剪力墙上部内嵌螺栓钢骨架,b、制作预制钢筋混凝土剪力墙下部内嵌螺栓钢骨架,c、制作钢骨螺栓连接形式预制钢筋混凝土剪力墙,d、上下片成品内嵌钢骨螺栓连接形式预制钢筋混凝土剪力墙安装。本发明的内嵌钢骨螺栓连接形式的预制钢筋混凝土剪力墙施工方法具有采用高强螺栓保证上片剪力墙与下片剪力墙节点的连接可靠度,保证上下片预制钢筋混凝土剪力墙连接质量、加快安装速度,使预制钢筋混凝土剪力墙节点连接更具有可见性,和隐蔽验收工作更简单、可靠的优点。
Construction method of prefabricated reinforced concrete wall in embedded steel rib bolt connection mode
A construction method of a prefabricated reinforced concrete wall in an embedded steel rib bolt connection mode is characterized by comprising the following steps of a, manufacturing an embedded bolt steel framework on the upper portion of a prefabricated reinforced concrete shear wall, b, manufacturing an embedded bolt steel framework on the lower portion of the prefabricated reinforced concrete shear wall, c, manufacturing the prefabricated reinforced concrete shear wall in the steel rib bolt connection mode, and d, constructing the prefabricated reinforced concrete shear wall in the embedded steel rib bolt connection mode. And d, the prefabricated reinforced concrete shear wall is installed in the upper and lower piece finished product embedded steel rib bolt connection mode. The construction method of the prefabricated reinforced concrete shear wall in the embedded steel rib bolt connection mode has the advantages that the high-strength bolts are adopted to guarantee the connection reliability of the upper shear wall and the lower shear wall, the connection quality of the upper and lower prefabricated reinforced concrete shear walls is guaranteed, and the installation speed is increased; and the prefabricated reinforced concrete shear wall node connection is more visible, and the hidden acceptance work is simpler and more reliable.
一种内嵌钢骨螺栓连接形式的预制钢筋混凝土墙施工方法,其特征在于包括以下步骤:a、制作预制钢筋混凝土剪力墙上部内嵌螺栓钢骨架,b、制作预制钢筋混凝土剪力墙下部内嵌螺栓钢骨架,c、制作钢骨螺栓连接形式预制钢筋混凝土剪力墙,d、上下片成品内嵌钢骨螺栓连接形式预制钢筋混凝土剪力墙安装。本发明的内嵌钢骨螺栓连接形式的预制钢筋混凝土剪力墙施工方法具有采用高强螺栓保证上片剪力墙与下片剪力墙节点的连接可靠度,保证上下片预制钢筋混凝土剪力墙连接质量、加快安装速度,使预制钢筋混凝土剪力墙节点连接更具有可见性,和隐蔽验收工作更简单、可靠的优点。
Construction method of prefabricated reinforced concrete wall in embedded steel rib bolt connection mode
一种内嵌钢骨螺栓连接形式的预制钢筋混凝土墙施工方法
MENG XIANGBAO (Autor:in) / SHI YUTING (Autor:in)
15.11.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|Bolt type prefabricated concrete connection point structure
Europäisches Patentamt | 2020
|