Advanced pre-supporting surrounding rock reinforcement process
The invention relates to an advanced pre-supporting surrounding rock reinforcing technology. The technology comprises the following steps that S1, horizontal jet grouting reinforcement is conducted on the outer contour of a tunnel excavation face; s2, the tunnel face is subjected to guniting reinforcement; s3, a guide arch frame is installed; s4, hole drilling, hole cleaning and hole inspection are carried out; s5, installing a small conduit, and sealing; s6, cement mortar is grouted into the soil layer through the small guide pipes; s7, standing and maintaining; the cement mortar comprises the following raw materials in parts by weight: 100-140 parts of superfine cement; 84 to 110 parts of mixing water; 0.4 to 0.6 part of a water reducing agent; 20 to 56 parts of fly ash; 1-5 parts of water glass; 8-12 parts of a slurry lubricant; 16 to 30 parts of reinforcing filler; and 11-15 parts of an expansion filler. The method has the effect of reducing the collapse probability of the surrounding rock.
本申请涉及一种超前预支护围岩加固工艺,包括以下步骤:S1、隧道开挖面外轮廓水平旋喷加固;S2、掌子面喷浆加固;S3、导向拱架安装;S4、钻孔、清孔和验孔;S5、小导管安装、封口;S6、通过小导管向土层内灌浆水泥砂浆;S7、静置养护;所述水泥砂浆包括以下重量份的原料:超细水泥100~140份;拌合水84~110份;减水剂0.4~0.6份;粉煤灰20~56份;水玻璃1~5份;泥浆润滑剂8~12份;增强填料16~30份;膨胀填料11~15份。本申请具有减小围岩坍塌的概率的效果。
Advanced pre-supporting surrounding rock reinforcement process
The invention relates to an advanced pre-supporting surrounding rock reinforcing technology. The technology comprises the following steps that S1, horizontal jet grouting reinforcement is conducted on the outer contour of a tunnel excavation face; s2, the tunnel face is subjected to guniting reinforcement; s3, a guide arch frame is installed; s4, hole drilling, hole cleaning and hole inspection are carried out; s5, installing a small conduit, and sealing; s6, cement mortar is grouted into the soil layer through the small guide pipes; s7, standing and maintaining; the cement mortar comprises the following raw materials in parts by weight: 100-140 parts of superfine cement; 84 to 110 parts of mixing water; 0.4 to 0.6 part of a water reducing agent; 20 to 56 parts of fly ash; 1-5 parts of water glass; 8-12 parts of a slurry lubricant; 16 to 30 parts of reinforcing filler; and 11-15 parts of an expansion filler. The method has the effect of reducing the collapse probability of the surrounding rock.
本申请涉及一种超前预支护围岩加固工艺,包括以下步骤:S1、隧道开挖面外轮廓水平旋喷加固;S2、掌子面喷浆加固;S3、导向拱架安装;S4、钻孔、清孔和验孔;S5、小导管安装、封口;S6、通过小导管向土层内灌浆水泥砂浆;S7、静置养护;所述水泥砂浆包括以下重量份的原料:超细水泥100~140份;拌合水84~110份;减水剂0.4~0.6份;粉煤灰20~56份;水玻璃1~5份;泥浆润滑剂8~12份;增强填料16~30份;膨胀填料11~15份。本申请具有减小围岩坍塌的概率的效果。
Advanced pre-supporting surrounding rock reinforcement process
一种超前预支护围岩加固工艺
DU ZHENYI (Autor:in) / GAO GUOQING (Autor:in) / YAN LEI (Autor:in)
15.11.2022
Patent
Elektronische Ressource
Chinesisch
Tunnel surrounding rock supporting method and supporting structure
Europäisches Patentamt | 2024
|Roadway (tunnel) surrounding rock flexible supporting method
Europäisches Patentamt | 2024
|Surrounding Rock Reinforcement of Underground Powerhouse by Joint Mapping
British Library Conference Proceedings | 2006
|Parameter Optimization on Bolt Supporting of Deep Roadway Surrounding Rock
Trans Tech Publications | 2013
|Inorganic composite grouting material for coal mine tunnel surrounding rock reinforcement
Europäisches Patentamt | 2024
|