Construction method of basement structure
The invention relates to the field of house buildings, in particular to a construction method of a basement structure, which comprises the following steps: S1, construction of a foundation slab: dividing construction areas in an area of the foundation slab to be poured according to design requirements and the position of a post-pouring belt; s2, basement columns, walls and a top plate are constructed, and after the foundation bottom plate is poured and formed, structural columns, walls and the top plate are sequentially constructed on the foundation bottom plate; s3, waterproof construction is conducted outside the upper opening of the basement, waterproof construction is conducted at the position of the upper opening of the basement, and waterproof is conducted at the construction joint of the basement; and S4, basement upper opening foundation backfilling is conducted, specifically, after basement upper opening waterproof construction is completed, sundries in the foundation pit are cleaned up, and a gap between a basement wall body and the side wall of the foundation pit is filled. The construction method has the effects of reducing the construction cost, reducing the labor cost and shortening the construction period.
本申请涉及房屋建筑的领域,尤其是涉及一种地下室结构的施工方法,其包括以下步骤:S1:基础底板施工,按照设计要求在待浇筑基础底板的区域,根据后浇带的位置划分施工区域;S2:地下室柱、墙、顶板施工,当基础底板浇筑成型后,在基础底板上依次进行结构柱、墙体和顶板的施工;S3:地下室上口外防水施工,在地下室上口的位置处进行防水施工,并且地下室的施工接缝处进行防水;S4:地下室上口基础回填,在地下室上口防水施工完成后,将基坑内的杂物清理干净,并对地下室墙体与基坑侧壁之间的缝隙进行填充。本申请具有降低施工成本、减少人工成本以及减少工期的效果。
Construction method of basement structure
The invention relates to the field of house buildings, in particular to a construction method of a basement structure, which comprises the following steps: S1, construction of a foundation slab: dividing construction areas in an area of the foundation slab to be poured according to design requirements and the position of a post-pouring belt; s2, basement columns, walls and a top plate are constructed, and after the foundation bottom plate is poured and formed, structural columns, walls and the top plate are sequentially constructed on the foundation bottom plate; s3, waterproof construction is conducted outside the upper opening of the basement, waterproof construction is conducted at the position of the upper opening of the basement, and waterproof is conducted at the construction joint of the basement; and S4, basement upper opening foundation backfilling is conducted, specifically, after basement upper opening waterproof construction is completed, sundries in the foundation pit are cleaned up, and a gap between a basement wall body and the side wall of the foundation pit is filled. The construction method has the effects of reducing the construction cost, reducing the labor cost and shortening the construction period.
本申请涉及房屋建筑的领域,尤其是涉及一种地下室结构的施工方法,其包括以下步骤:S1:基础底板施工,按照设计要求在待浇筑基础底板的区域,根据后浇带的位置划分施工区域;S2:地下室柱、墙、顶板施工,当基础底板浇筑成型后,在基础底板上依次进行结构柱、墙体和顶板的施工;S3:地下室上口外防水施工,在地下室上口的位置处进行防水施工,并且地下室的施工接缝处进行防水;S4:地下室上口基础回填,在地下室上口防水施工完成后,将基坑内的杂物清理干净,并对地下室墙体与基坑侧壁之间的缝隙进行填充。本申请具有降低施工成本、减少人工成本以及减少工期的效果。
Construction method of basement structure
一种地下室结构的施工方法
LIN KE (Autor:in) / GONG YINGYIN (Autor:in) / NI YIZHE (Autor:in) / ZHOU GANG (Autor:in) / GONG QIAN (Autor:in)
22.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
BASEMENT ATTIC STRUCTURE, AND BASEMENT CONSTRUCTION METHOD USING THE BASEMENT ATTIC STRUCTURE
Europäisches Patentamt | 2018
|Basement floor construction method and basement floor structure
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|