Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated building and construction method thereof
The invention discloses a fabricated building and a construction method thereof, and relates to the technical field of building engineering.The fabricated building comprises a fabricated building main body, a fabricated building door body is hinged to the front face of the fabricated building main body, and fabricated building stairs are movably mounted on the front face of the fabricated building main body; ventilation windows are arranged on the two sides of the exterior of the assembly type building body, a rainproof awning is arranged on the top of the assembly type building body, and drainage devices are arranged on the two sides of the rainproof awning. Rainwater flows into the flow guide groove through the arrangement of the rain cover, then the flow guide plate is utilized, rainwater can flow to the water drainage opening along the surface of the flow guide plate, then the water drainage pipe is arranged to achieve the water drainage effect, and before installation, the distance between the fixing blocks is adjusted through the cooperation between the adjusting threaded rod and the adjusting handle, so that the water drainage effect is improved. And meanwhile, a vertical sliding plate is arranged for vertical adjustment, so that the utilization efficiency of the fabricated building is improved.
本发明公开了一种装配式建筑及其施工方法,涉及建筑工程技术领域,包括装配式建筑主体,所述装配式建筑主体的正面铰接有装配式建筑门体,所述装配式建筑主体的正面活动安装有装配式建筑楼梯,所述装配式建筑主体的外部两侧设置有通风窗,所述装配式建筑主体的顶部设置有防雨篷,所述防雨篷的两侧设置有排水装置。本发明通过设置防雨篷流入到导流槽的内部,然后通过利用导流板,雨水会沿其表面流淌至排水口,再通过设置排水管以便达到排水效果,以及在安装之前,通过设置调节螺纹杆和调节手柄之间的配合,调节固定块的距离,从而调节装置与墙壁之间的距离,同时通过设置竖直滑板进行竖向调节,从而提高了装配式建筑的利用效率。
Fabricated building and construction method thereof
The invention discloses a fabricated building and a construction method thereof, and relates to the technical field of building engineering.The fabricated building comprises a fabricated building main body, a fabricated building door body is hinged to the front face of the fabricated building main body, and fabricated building stairs are movably mounted on the front face of the fabricated building main body; ventilation windows are arranged on the two sides of the exterior of the assembly type building body, a rainproof awning is arranged on the top of the assembly type building body, and drainage devices are arranged on the two sides of the rainproof awning. Rainwater flows into the flow guide groove through the arrangement of the rain cover, then the flow guide plate is utilized, rainwater can flow to the water drainage opening along the surface of the flow guide plate, then the water drainage pipe is arranged to achieve the water drainage effect, and before installation, the distance between the fixing blocks is adjusted through the cooperation between the adjusting threaded rod and the adjusting handle, so that the water drainage effect is improved. And meanwhile, a vertical sliding plate is arranged for vertical adjustment, so that the utilization efficiency of the fabricated building is improved.
本发明公开了一种装配式建筑及其施工方法,涉及建筑工程技术领域,包括装配式建筑主体,所述装配式建筑主体的正面铰接有装配式建筑门体,所述装配式建筑主体的正面活动安装有装配式建筑楼梯,所述装配式建筑主体的外部两侧设置有通风窗,所述装配式建筑主体的顶部设置有防雨篷,所述防雨篷的两侧设置有排水装置。本发明通过设置防雨篷流入到导流槽的内部,然后通过利用导流板,雨水会沿其表面流淌至排水口,再通过设置排水管以便达到排水效果,以及在安装之前,通过设置调节螺纹杆和调节手柄之间的配合,调节固定块的距离,从而调节装置与墙壁之间的距离,同时通过设置竖直滑板进行竖向调节,从而提高了装配式建筑的利用效率。
Fabricated building and construction method thereof
一种装配式建筑及其施工方法
YAN XIANWU (Autor:in)
22.11.2022
Patent
Elektronische Ressource
Chinesisch