Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water conservancy project retaining wall and construction method
The water conservancy project retaining wall comprises a trapezoidal wall body, and a plurality of sliding grooves are transversely formed in the trapezoidal wall body in a penetrating mode; the guide rod is inserted into the sliding groove in a sliding manner; the baffle is arranged on the right side of the trapezoidal wall body, and the right end of the guide rod is detachably connected with the baffle; the right end of the guide rod is sleeved with the first spring, the first spring is located between the trapezoidal wall body and the baffle, and the left end of the first spring is fixedly connected with the guide rod. By arranging the baffle, the baffle can bear most river water impact, the baffle repeatedly compresses the first spring under the river water impact, effective buffering can be formed, when the baffle is seriously damaged after being used for a long time, the troublesome maintenance step is omitted by taking down the limiting screw and the limiting disc, then taking down the old baffle and then replacing the old baffle with a new baffle, and the maintenance cost is reduced. And the baffle plate can be quickly replaced.
本发明公开了一种水利工程挡土墙,包括:梯形墙体,所述梯形墙体内部横向贯穿开设有多个滑槽;导向杆,所述导向杆滑动插接在滑槽内;挡板,所述挡板设置在梯形墙体右侧,所述导向杆右端与挡板可拆卸式连接;第一弹簧,所述第一弹簧套设在导向杆右端,所述第一弹簧位于梯形墙体与挡板之间,所述第一弹簧左端与导向杆固接。本发明通过设置挡板,可以使挡板承受大部分河水冲击,且在河水冲击下挡板反复压缩第一弹簧,可以形成有效缓冲,且当挡板长期使用损毁严重时,通过取下限位螺杆、限位盘,再取下旧挡板,再换上新的挡板,省去了麻烦的维修步骤,可以快捷的完成对挡板的更换。
Water conservancy project retaining wall and construction method
The water conservancy project retaining wall comprises a trapezoidal wall body, and a plurality of sliding grooves are transversely formed in the trapezoidal wall body in a penetrating mode; the guide rod is inserted into the sliding groove in a sliding manner; the baffle is arranged on the right side of the trapezoidal wall body, and the right end of the guide rod is detachably connected with the baffle; the right end of the guide rod is sleeved with the first spring, the first spring is located between the trapezoidal wall body and the baffle, and the left end of the first spring is fixedly connected with the guide rod. By arranging the baffle, the baffle can bear most river water impact, the baffle repeatedly compresses the first spring under the river water impact, effective buffering can be formed, when the baffle is seriously damaged after being used for a long time, the troublesome maintenance step is omitted by taking down the limiting screw and the limiting disc, then taking down the old baffle and then replacing the old baffle with a new baffle, and the maintenance cost is reduced. And the baffle plate can be quickly replaced.
本发明公开了一种水利工程挡土墙,包括:梯形墙体,所述梯形墙体内部横向贯穿开设有多个滑槽;导向杆,所述导向杆滑动插接在滑槽内;挡板,所述挡板设置在梯形墙体右侧,所述导向杆右端与挡板可拆卸式连接;第一弹簧,所述第一弹簧套设在导向杆右端,所述第一弹簧位于梯形墙体与挡板之间,所述第一弹簧左端与导向杆固接。本发明通过设置挡板,可以使挡板承受大部分河水冲击,且在河水冲击下挡板反复压缩第一弹簧,可以形成有效缓冲,且当挡板长期使用损毁严重时,通过取下限位螺杆、限位盘,再取下旧挡板,再换上新的挡板,省去了麻烦的维修步骤,可以快捷的完成对挡板的更换。
Water conservancy project retaining wall and construction method
一种水利工程挡土墙及施工方法
LU XIAOBING (Autor:in) / WANG WEI (Autor:in) / HAO ZHIJIAN (Autor:in) / ZHANG XU (Autor:in) / NONG SHAN (Autor:in) / CHEN YUANZHAO (Autor:in) / LIU GUO (Autor:in) / LIANG ZHAOWEI (Autor:in) / ZENG XIANGYUN (Autor:in) / SHAO SHIPENG (Autor:in)
25.11.2022
Patent
Elektronische Ressource
Chinesisch
Water conservancy project retaining wall and construction method
Europäisches Patentamt | 2015
|