Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-rise hollow concrete frame construction technology
The invention discloses a high-rise hollow-out concrete frame construction technology which is suitable for the situation that hoisting holes need to be reserved in a frame, and according to the engineering characteristics of the high-rise hollow-out concrete frame construction technology, according to local conditions, the hoisting holes are reserved in the frame from the aspects of foundation construction, reinforcing steel bars, formworks, concrete, structural layers, lightning protection grounding, masonry subentry engineering and the like. And approaches and measures for improving the construction technology are actively explored and sought, so that the quality level of the high-rise concrete frame construction technology is effectively improved, and the safety is improved.
本发明公开了一种高层镂空砼框架施工工艺,适用于需要在框架内预留吊装孔洞的情形,本发明根据自身的工程特点,因地制宜,从地基施工、钢筋、模板、混凝土、结构层、防雷接地、砌体分项工程等方面,积极的探索和寻求提高施工技术的途径和措施,从而有效的提高高层混凝土框架施工技术质量水平,增加安全性。
High-rise hollow concrete frame construction technology
The invention discloses a high-rise hollow-out concrete frame construction technology which is suitable for the situation that hoisting holes need to be reserved in a frame, and according to the engineering characteristics of the high-rise hollow-out concrete frame construction technology, according to local conditions, the hoisting holes are reserved in the frame from the aspects of foundation construction, reinforcing steel bars, formworks, concrete, structural layers, lightning protection grounding, masonry subentry engineering and the like. And approaches and measures for improving the construction technology are actively explored and sought, so that the quality level of the high-rise concrete frame construction technology is effectively improved, and the safety is improved.
本发明公开了一种高层镂空砼框架施工工艺,适用于需要在框架内预留吊装孔洞的情形,本发明根据自身的工程特点,因地制宜,从地基施工、钢筋、模板、混凝土、结构层、防雷接地、砌体分项工程等方面,积极的探索和寻求提高施工技术的途径和措施,从而有效的提高高层混凝土框架施工技术质量水平,增加安全性。
High-rise hollow concrete frame construction technology
一种高层镂空砼框架施工工艺
ZHOU XIAJU (Autor:in) / YANG FAN (Autor:in) / TANG YANLI (Autor:in) / ZHANG XUE (Autor:in)
29.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
HIGH-RISE STRUCTURES - Innovation in concrete frame construction
Online Contents | 2005
|HIGH-RISE CONSTRUCTION - High-rise concrete construction at Canary Wharf
Online Contents | 2001
|HIGH-RISE CONSTRUCTION - Durable high-strength concrete for high-rise construction
Online Contents | 2009
|Study on Concrete Construction Technology of High-Rise Building
British Library Conference Proceedings | 2015
|