Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention provides a comprehensive prevention and control structure for a geotechnical engineering gravelly soil slope, and relates to the field of engineering protection, the comprehensive prevention and control structure comprises a fixing assembly, the fixing assembly is fixed at the top position of a soil slope main body through a fixing piece, and the fixing assembly is fixed at the top position of the soil slope main body; the bearing component connected to the fixing assembly is stably laid on the slope of the soil slope body, the blocking component on the bearing component has the effect of blocking the rolling direction of stones, the speed reducing component on the blocking component can reduce the speed of the stones, and the speed reducing component on the blocking component is of a separated structure. The collecting component at the bottom of the bearing component can block the stones, the stones fall to a trench through the buffering component of the collecting component, a good gravel treatment effect is achieved, and an existing prevention and treatment structure for blocking the stones and a speed reduction prevention and treatment structure which cannot stably guarantee blocking of the stones are facilitated. The problem that unnecessary potential safety hazards are caused due to the fact that multiple impact of many stones cannot be borne is solved.
本发明提供一种岩土工程碎石土边坡综合防治结构,涉及工程防护领域,包括:固定组件,所述固定组件通过固定件固定在土坡主体的顶部位置,将固定组件固定在土坡主体的顶部位置,固定组件上连接的承载部件稳定铺设在土坡主体的斜面上,承载部件上的阻挡部件具有阻挡石块的滚动方向的作用,阻挡部件上的减速部件,能够对石块进行减速,阻挡部件上的减速部件为分离结构,承载部件底部的收集部件会将石块阻挡,让石块通过收集部件的缓冲部件落向地沟处,达到良好的对碎石的处理效果,有利于对现有对石块的阻挡的防治结构,无法稳定保证对石块的阻挡,而减速类的防治结构,不能承受较多的石块多次的冲击,造成不必要的安全隐患的问题。
The invention provides a comprehensive prevention and control structure for a geotechnical engineering gravelly soil slope, and relates to the field of engineering protection, the comprehensive prevention and control structure comprises a fixing assembly, the fixing assembly is fixed at the top position of a soil slope main body through a fixing piece, and the fixing assembly is fixed at the top position of the soil slope main body; the bearing component connected to the fixing assembly is stably laid on the slope of the soil slope body, the blocking component on the bearing component has the effect of blocking the rolling direction of stones, the speed reducing component on the blocking component can reduce the speed of the stones, and the speed reducing component on the blocking component is of a separated structure. The collecting component at the bottom of the bearing component can block the stones, the stones fall to a trench through the buffering component of the collecting component, a good gravel treatment effect is achieved, and an existing prevention and treatment structure for blocking the stones and a speed reduction prevention and treatment structure which cannot stably guarantee blocking of the stones are facilitated. The problem that unnecessary potential safety hazards are caused due to the fact that multiple impact of many stones cannot be borne is solved.
本发明提供一种岩土工程碎石土边坡综合防治结构,涉及工程防护领域,包括:固定组件,所述固定组件通过固定件固定在土坡主体的顶部位置,将固定组件固定在土坡主体的顶部位置,固定组件上连接的承载部件稳定铺设在土坡主体的斜面上,承载部件上的阻挡部件具有阻挡石块的滚动方向的作用,阻挡部件上的减速部件,能够对石块进行减速,阻挡部件上的减速部件为分离结构,承载部件底部的收集部件会将石块阻挡,让石块通过收集部件的缓冲部件落向地沟处,达到良好的对碎石的处理效果,有利于对现有对石块的阻挡的防治结构,无法稳定保证对石块的阻挡,而减速类的防治结构,不能承受较多的石块多次的冲击,造成不必要的安全隐患的问题。
Geotechnical engineering gravelly soil slope comprehensive prevention and control structure
一种岩土工程碎石土边坡综合防治结构
LI CHENG (Autor:in)
02.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Geotechnical engineering slope water seepage prevention structure
Europäisches Patentamt | 2021
|Water seepage prevention structure of geotechnical engineering slope
Europäisches Patentamt | 2022
|Water seepage prevention structure of geotechnical engineering slope
Europäisches Patentamt | 2023
|Water seepage prevention structure of geotechnical engineering slope
Europäisches Patentamt | 2024
|Waterproof energy dissipation supporting structure for gravelly soil side slope
Europäisches Patentamt | 2023
|