Farm construction excrement pipeline burying construction method
The invention discloses an excrement pipeline burying construction method for farm construction, which belongs to the technical field of sewage pipeline construction treatment, and comprises the following steps: step 1, pipeline paying-off is carried out according to a drawing, step 2, pipeline grooving is carried out, and step 3, the bottom of a tee joint needs to be fixedly supported every 3 meters according to the gradient. According to the farm construction fecal pipeline burying construction method, in the actual construction process, the ground is leveled, the pipeline paying-off precision can be guaranteed, construction errors are avoided, groove bottom surface soil must be cleaned up, the groove bottom surface soil is clean, and the level difference generated during pipeline installation can be avoided; by means of the fixing support, the pipeline can be protected, the situation that the pipeline is damaged due to water pressure generated at the confluence position is avoided, meanwhile, the pipeline is installed, the installation quality can be guaranteed, gaps are avoided, and stress generated by sedimentation is resisted.
本发明公开了一种养殖场建设粪污管道埋设施工方法,属于排污管道施工处理技术领域,包括以下步骤:步骤一、按照图纸进行管道放线,步骤二、管道挖槽,步骤三、据坡度每隔3米,三通处底部必须做固定支撑。该养殖场建设粪污管道埋设施工方法,该养殖场建设粪污管道埋设施工方法,在实际的施工过程中采用对地面平整,可以保证管道放线的精度,避免产生建设误差,槽底浮土必须清理干净,槽底浮土清洁,可以避免管道安装产生水平差,通过固定支撑,可以保证对管道的保护,避免汇流处产生的水压,导致管道产生破损,同时对管道的安装,可以保证安装质量,避免产生缝隙,抵抗沉降产生的应力。
Farm construction excrement pipeline burying construction method
The invention discloses an excrement pipeline burying construction method for farm construction, which belongs to the technical field of sewage pipeline construction treatment, and comprises the following steps: step 1, pipeline paying-off is carried out according to a drawing, step 2, pipeline grooving is carried out, and step 3, the bottom of a tee joint needs to be fixedly supported every 3 meters according to the gradient. According to the farm construction fecal pipeline burying construction method, in the actual construction process, the ground is leveled, the pipeline paying-off precision can be guaranteed, construction errors are avoided, groove bottom surface soil must be cleaned up, the groove bottom surface soil is clean, and the level difference generated during pipeline installation can be avoided; by means of the fixing support, the pipeline can be protected, the situation that the pipeline is damaged due to water pressure generated at the confluence position is avoided, meanwhile, the pipeline is installed, the installation quality can be guaranteed, gaps are avoided, and stress generated by sedimentation is resisted.
本发明公开了一种养殖场建设粪污管道埋设施工方法,属于排污管道施工处理技术领域,包括以下步骤:步骤一、按照图纸进行管道放线,步骤二、管道挖槽,步骤三、据坡度每隔3米,三通处底部必须做固定支撑。该养殖场建设粪污管道埋设施工方法,该养殖场建设粪污管道埋设施工方法,在实际的施工过程中采用对地面平整,可以保证管道放线的精度,避免产生建设误差,槽底浮土必须清理干净,槽底浮土清洁,可以避免管道安装产生水平差,通过固定支撑,可以保证对管道的保护,避免汇流处产生的水压,导致管道产生破损,同时对管道的安装,可以保证安装质量,避免产生缝隙,抵抗沉降产生的应力。
Farm construction excrement pipeline burying construction method
一种养殖场建设粪污管道埋设施工方法
YANG GUANGYANG (Autor:in) / RONG SHIJIN (Autor:in) / WANG ZHENYU (Autor:in)
06.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Municipal pipeline burying equipment and construction method thereof
Europäisches Patentamt | 2024
|Free pre-burying construction method of wall pipeline
Europäisches Patentamt | 2015
|Trenchless directional drilling construction method for pipeline burying channel
Europäisches Patentamt | 2021
|Water conservancy pipeline pre-burying device and construction method thereof
Europäisches Patentamt | 2022
Water conservancy pipeline pre-burying device and construction method thereof
Europäisches Patentamt | 2021
|