Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for reinforcing soft soil foundation of retaining wall
The invention relates to the technical field of building construction, in particular to a construction method for retaining wall soft soil foundation reinforcement treatment, which comprises the steps of prefabricated square pile preparation, foundation leveling, surveying, setting out and positioning, prefabricated square pile construction, cushion layer construction, concrete rubble layer pouring and the like. According to the construction method, several materials such as prefabricated square piles, gravel, cushion concrete, rubbles and cement mortar are mainly adopted for retaining wall soft soil foundation reinforcement treatment, and the construction method has the advantages that the soft soil foundation treatment effect is good, the materials are easy to obtain, the manufacturing cost is low, operation is easy, practicability is high, construction is safe, the mechanical utilization rate is high, and the service life of a retaining wall can be prolonged; the method is suitable for reinforcement treatment of various roads such as municipal roads, highways and railways and abutment retaining wall soft soil foundations.
本发明涉及建筑施工技术领域,尤其涉及一种用于挡墙软土地基加固处理的施工方法,该施工方法包括预制方桩准备、基础整平、测量放线定位、预制方桩施工、垫层施工、浇筑混凝土片石层等步骤。该施工方法主要采用预制方桩、碎石、垫层混凝土、片石、水泥砂浆等几种材料进行挡墙软土地基加固处理,具有软土地基处理效果好,材料易得,造价成本低廉,操作简单、实用性强、施工安全、机械利用率高,能够提高挡墙使用寿命的优点,适用于市政道路、高速路、铁路等多种道路及桥台挡墙软土地基的加固处理。
Construction method for reinforcing soft soil foundation of retaining wall
The invention relates to the technical field of building construction, in particular to a construction method for retaining wall soft soil foundation reinforcement treatment, which comprises the steps of prefabricated square pile preparation, foundation leveling, surveying, setting out and positioning, prefabricated square pile construction, cushion layer construction, concrete rubble layer pouring and the like. According to the construction method, several materials such as prefabricated square piles, gravel, cushion concrete, rubbles and cement mortar are mainly adopted for retaining wall soft soil foundation reinforcement treatment, and the construction method has the advantages that the soft soil foundation treatment effect is good, the materials are easy to obtain, the manufacturing cost is low, operation is easy, practicability is high, construction is safe, the mechanical utilization rate is high, and the service life of a retaining wall can be prolonged; the method is suitable for reinforcement treatment of various roads such as municipal roads, highways and railways and abutment retaining wall soft soil foundations.
本发明涉及建筑施工技术领域,尤其涉及一种用于挡墙软土地基加固处理的施工方法,该施工方法包括预制方桩准备、基础整平、测量放线定位、预制方桩施工、垫层施工、浇筑混凝土片石层等步骤。该施工方法主要采用预制方桩、碎石、垫层混凝土、片石、水泥砂浆等几种材料进行挡墙软土地基加固处理,具有软土地基处理效果好,材料易得,造价成本低廉,操作简单、实用性强、施工安全、机械利用率高,能够提高挡墙使用寿命的优点,适用于市政道路、高速路、铁路等多种道路及桥台挡墙软土地基的加固处理。
Construction method for reinforcing soft soil foundation of retaining wall
一种用于挡墙软土地基加固处理的施工方法
YAN KAIHONG (Autor:in) / FANG QI (Autor:in)
09.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Construction method for reinforcing soft soil foundation
Europäisches Patentamt | 2021
|Miniature steel pipe pile retaining wall foundation reinforcing method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|