Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of municipal road finishing, in particular to municipal road finishing equipment which comprises a main support, a side pressing support, an auxiliary support, a bucket support, a roller rammer support, a push tooth plate support and a traction rod. An auxiliary support for supporting the auxiliary roller mechanism is arranged at the left end of the side pressing support, a roller rammer support is installed at the lower end of the main support, a push tooth plate support is arranged at the left end of the main support, and a bucket support is arranged on the right side of the main support. The invention can solve the following problems in the existing curbstone foundation pit finishing construction: the side wall of the foundation pit cannot be compacted by manually scraping and finishing the curbstone foundation pit; when the bottom of the road edge stone foundation pit is tamped, the bottom of the foundation pit is uneven due to different tamping degrees; and manual cleaning of debris such as gravel at the bottom of the foundation pit is low in efficiency.
本发明涉及市政道路修整技术领域,特别涉及一种市政道路修整设备,包括主支架、侧压支架、辅助支架、铲斗支架、辊夯支架、推齿板支架和牵引杆,主支架的左端下侧设置有对侧压装置进行支撑的侧压支架,侧压支架的左端设置有对辅辊机构进行支撑的辅助支架,主支架的下端安装有辊夯支架,主支架的左端设置有推齿板支架,主支架的右侧设置有铲斗支架。本发明可以解决现有路沿石基坑修整施工存在的:人工方式刮铲修整路沿石基坑不能对基坑侧壁进行压实处理;进行路沿石基坑底部夯实作业时,基坑底部因夯实程度不同而造成的底部不平整;人工清理基坑底部碎石等杂物效率低等难题。
The invention relates to the technical field of municipal road finishing, in particular to municipal road finishing equipment which comprises a main support, a side pressing support, an auxiliary support, a bucket support, a roller rammer support, a push tooth plate support and a traction rod. An auxiliary support for supporting the auxiliary roller mechanism is arranged at the left end of the side pressing support, a roller rammer support is installed at the lower end of the main support, a push tooth plate support is arranged at the left end of the main support, and a bucket support is arranged on the right side of the main support. The invention can solve the following problems in the existing curbstone foundation pit finishing construction: the side wall of the foundation pit cannot be compacted by manually scraping and finishing the curbstone foundation pit; when the bottom of the road edge stone foundation pit is tamped, the bottom of the foundation pit is uneven due to different tamping degrees; and manual cleaning of debris such as gravel at the bottom of the foundation pit is low in efficiency.
本发明涉及市政道路修整技术领域,特别涉及一种市政道路修整设备,包括主支架、侧压支架、辅助支架、铲斗支架、辊夯支架、推齿板支架和牵引杆,主支架的左端下侧设置有对侧压装置进行支撑的侧压支架,侧压支架的左端设置有对辅辊机构进行支撑的辅助支架,主支架的下端安装有辊夯支架,主支架的左端设置有推齿板支架,主支架的右侧设置有铲斗支架。本发明可以解决现有路沿石基坑修整施工存在的:人工方式刮铲修整路沿石基坑不能对基坑侧壁进行压实处理;进行路沿石基坑底部夯实作业时,基坑底部因夯实程度不同而造成的底部不平整;人工清理基坑底部碎石等杂物效率低等难题。
Municipal road finishing equipment
一种市政道路修整设备
XIA XI (Autor:in)
09.12.2022
Patent
Elektronische Ressource
Chinesisch
Crushing equipment for finishing bump ground of municipal road and using method thereof
Europäisches Patentamt | 2021
|