Municipal road construction method
The invention discloses a municipal road construction method in the technical field of municipal roads, and the municipal road construction method comprises the following steps: S01, earth excavation: earth excavation construction including loosening, crushing, digging, transporting, deslagging and the like, rock excavation: loose rock can be excavated by using a scarifier through a chiseling method, and generally loosening and crushing are performed by using a blasting method, so that the rock excavation efficiency is greatly improved; manual and semi-mechanical excavation is carried out, simple tools such as a spade, an air pick and an air drill are used, and lifting or simple and small transportation tools are matched for operation. According to the road surface compaction roller dismounting device disclosed by the invention, a T-shaped connecting shaft is extruded towards the inner side, a reset spring is shrunk and shortened, and the T-shaped connecting shaft is separated from the interior of a connecting shaft hole, so that a road surface compaction roller can be dismounted from the interior of an external assembly at the moment; and the pavement compaction roller can be simply and conveniently disassembled from the interior of the external assembly, so that the disassembly efficiency of the pavement compaction roller is greatly improved.
本发明公开了市政道路技术领域的一种市政道路施工方法,包括如下步骤:S01、土方开挖,土方开挖施工,包括松动、破碎、挖装、运输出渣等工序,石方开挖,除松软岩石可用松土器以凿裂法开挖外,一般需以爆破的方法进行松动、破碎,人工和半机械化开挖,使用锹镐、风镐、风钻等简单工具,配合挑抬或者简易小型的运输工具进行作业。本发明通过向内侧挤压T形连接轴,复位弹簧将会收缩变短,T形连接轴将会从连接轴孔的内部脱离,此时即可将路面压实辊从外部组件的内部拆卸下来,本发明当需要对路面压实辊进行更换时,能够简单方便的将路面压实辊从外部组件的内部拆卸下来,从而极大的提高了路面压实辊的拆卸效率。
Municipal road construction method
The invention discloses a municipal road construction method in the technical field of municipal roads, and the municipal road construction method comprises the following steps: S01, earth excavation: earth excavation construction including loosening, crushing, digging, transporting, deslagging and the like, rock excavation: loose rock can be excavated by using a scarifier through a chiseling method, and generally loosening and crushing are performed by using a blasting method, so that the rock excavation efficiency is greatly improved; manual and semi-mechanical excavation is carried out, simple tools such as a spade, an air pick and an air drill are used, and lifting or simple and small transportation tools are matched for operation. According to the road surface compaction roller dismounting device disclosed by the invention, a T-shaped connecting shaft is extruded towards the inner side, a reset spring is shrunk and shortened, and the T-shaped connecting shaft is separated from the interior of a connecting shaft hole, so that a road surface compaction roller can be dismounted from the interior of an external assembly at the moment; and the pavement compaction roller can be simply and conveniently disassembled from the interior of the external assembly, so that the disassembly efficiency of the pavement compaction roller is greatly improved.
本发明公开了市政道路技术领域的一种市政道路施工方法,包括如下步骤:S01、土方开挖,土方开挖施工,包括松动、破碎、挖装、运输出渣等工序,石方开挖,除松软岩石可用松土器以凿裂法开挖外,一般需以爆破的方法进行松动、破碎,人工和半机械化开挖,使用锹镐、风镐、风钻等简单工具,配合挑抬或者简易小型的运输工具进行作业。本发明通过向内侧挤压T形连接轴,复位弹簧将会收缩变短,T形连接轴将会从连接轴孔的内部脱离,此时即可将路面压实辊从外部组件的内部拆卸下来,本发明当需要对路面压实辊进行更换时,能够简单方便的将路面压实辊从外部组件的内部拆卸下来,从而极大的提高了路面压实辊的拆卸效率。