Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to an energy-saving building, in particular to a green energy-saving building and a construction method thereof. The device comprises a wall body arranged on the ground, a reserved hole is formed in the side wall of the wall body in a penetrating mode, a liquid storage cavity is formed in the wall body, the liquid storage cavity is located below the reserved hole, a liquid conveying channel is formed in the wall body and used for conveying condensate water of the air conditioner into the liquid storage cavity, a window frame is fixedly arranged in the reserved hole, and the window frame is fixedly connected with the liquid storage cavity. According to the green energy-saving building and the construction method thereof, condensate water discharged by the air conditioner is collected, then external gas is guided into the heat exchange cavity, the gas is primarily cooled, the primarily cooled gas makes contact with the condensate water through the heat exchange part for heat exchange, secondary cooling is achieved, and finally the secondarily cooled gas is discharged into a room. Therefore, the indoor temperature can be adjusted during ventilation.
本发明涉及一种节能建筑,具体地说,涉及一种绿色节能建筑及其施工方法。其包括设置在地面上的墙体,所述墙体的侧壁贯穿开设有预留洞,所述墙体内开设有储液腔,所述储液腔位于预留洞的下方,所述墙体内开设有输液道,所述输液道用于将空调的冷凝水输送到所述储液腔内,所述预留洞内固定设置有窗框,该绿色节能建筑及其施工方法中,先对空调排出的冷凝水进行收集,然后将外界的气体引导至换热腔内,对该气体件初步降温,经初步降温后的气体通过换热件与冷凝水接触换热,实现二次降温,最后将二次降温后的气体排入室内,以在通风换气时调节室内的温度。
The invention relates to an energy-saving building, in particular to a green energy-saving building and a construction method thereof. The device comprises a wall body arranged on the ground, a reserved hole is formed in the side wall of the wall body in a penetrating mode, a liquid storage cavity is formed in the wall body, the liquid storage cavity is located below the reserved hole, a liquid conveying channel is formed in the wall body and used for conveying condensate water of the air conditioner into the liquid storage cavity, a window frame is fixedly arranged in the reserved hole, and the window frame is fixedly connected with the liquid storage cavity. According to the green energy-saving building and the construction method thereof, condensate water discharged by the air conditioner is collected, then external gas is guided into the heat exchange cavity, the gas is primarily cooled, the primarily cooled gas makes contact with the condensate water through the heat exchange part for heat exchange, secondary cooling is achieved, and finally the secondarily cooled gas is discharged into a room. Therefore, the indoor temperature can be adjusted during ventilation.
本发明涉及一种节能建筑,具体地说,涉及一种绿色节能建筑及其施工方法。其包括设置在地面上的墙体,所述墙体的侧壁贯穿开设有预留洞,所述墙体内开设有储液腔,所述储液腔位于预留洞的下方,所述墙体内开设有输液道,所述输液道用于将空调的冷凝水输送到所述储液腔内,所述预留洞内固定设置有窗框,该绿色节能建筑及其施工方法中,先对空调排出的冷凝水进行收集,然后将外界的气体引导至换热腔内,对该气体件初步降温,经初步降温后的气体通过换热件与冷凝水接触换热,实现二次降温,最后将二次降温后的气体排入室内,以在通风换气时调节室内的温度。
Green energy-saving building and construction method thereof
一种绿色节能建筑及其施工方法
LI LI (Autor:in)
13.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
/
F24F
Klimatisierung
,
AIR-CONDITIONING
Green energy-saving building and construction method thereof
Europäisches Patentamt | 2021
|Green energy-saving building and construction method thereof
Europäisches Patentamt | 2022
|Green energy-saving building and construction method thereof
Europäisches Patentamt | 2023
|Green energy-saving building and construction method thereof
Europäisches Patentamt | 2020
|Green energy-saving building and construction method thereof
Europäisches Patentamt | 2023
|