Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Road construction roadbed maintenance system and method
The invention relates to the field of highway construction, in particular to a highway construction roadbed maintenance system and method. According to the road construction roadbed maintenance system and method, the geotechnical cloth can cover the construction roadbed more completely, and therefore the roadbed can be maintained better. The invention discloses a road construction roadbed maintenance system and method. The system comprises a main frame, front rolling wheels, rear driving wheels, a motor supporting frame and the like. The front rolling wheel is rotationally connected to the lower portion of the main frame, the rear driving wheel is rotationally connected to the side, away from the front rolling wheel, of the main frame, and the motor supporting frame is fixedly connected to the side, close to the rear driving wheel, of the main frame. Wherein two rotating discs rotate to drive the other two rotating discs to rotate through a transmission rod, the other two rotating discs rotate to drive a rotating rod with threads to rotate, the rotating rod with the threads rotates to unfold the two sides of the geotechnical cloth, the two sides of the geotechnical cloth are smoother, and therefore the geotechnical cloth can cover a construction roadbed more completely; and the construction roadbed can be better maintained.
本发明涉及公路施工领域,尤其涉及一种公路施工路基养护系统及方法。本发明提供一种能够让土工布更加完整地覆盖施工路基从而更好养护路基的公路施工路基养护系统及方法。一种公路施工路基养护系统及方法,包括有主框架、前滚轮、后驱动轮、电机支撑架等;所述前滚轮转动式连接在主框架下部,所述后驱动轮转动式连接在主框架远离前滚轮的一侧,所述电机支撑架固接在主框架靠近后驱动轮的一侧。其中两个转动盘转动会通过传动杆带动另外两个转动盘转动,另外两个转动盘转动带动带螺纹转动杆转动,带螺纹转动杆转动会将土工布两侧进行展开,让土工布的两侧更加平整,从而让土工布更加完整地覆盖施工路基,便于更好地养护施工路基。
Road construction roadbed maintenance system and method
The invention relates to the field of highway construction, in particular to a highway construction roadbed maintenance system and method. According to the road construction roadbed maintenance system and method, the geotechnical cloth can cover the construction roadbed more completely, and therefore the roadbed can be maintained better. The invention discloses a road construction roadbed maintenance system and method. The system comprises a main frame, front rolling wheels, rear driving wheels, a motor supporting frame and the like. The front rolling wheel is rotationally connected to the lower portion of the main frame, the rear driving wheel is rotationally connected to the side, away from the front rolling wheel, of the main frame, and the motor supporting frame is fixedly connected to the side, close to the rear driving wheel, of the main frame. Wherein two rotating discs rotate to drive the other two rotating discs to rotate through a transmission rod, the other two rotating discs rotate to drive a rotating rod with threads to rotate, the rotating rod with the threads rotates to unfold the two sides of the geotechnical cloth, the two sides of the geotechnical cloth are smoother, and therefore the geotechnical cloth can cover a construction roadbed more completely; and the construction roadbed can be better maintained.
本发明涉及公路施工领域,尤其涉及一种公路施工路基养护系统及方法。本发明提供一种能够让土工布更加完整地覆盖施工路基从而更好养护路基的公路施工路基养护系统及方法。一种公路施工路基养护系统及方法,包括有主框架、前滚轮、后驱动轮、电机支撑架等;所述前滚轮转动式连接在主框架下部,所述后驱动轮转动式连接在主框架远离前滚轮的一侧,所述电机支撑架固接在主框架靠近后驱动轮的一侧。其中两个转动盘转动会通过传动杆带动另外两个转动盘转动,另外两个转动盘转动带动带螺纹转动杆转动,带螺纹转动杆转动会将土工布两侧进行展开,让土工布的两侧更加平整,从而让土工布更加完整地覆盖施工路基,便于更好地养护施工路基。
Road construction roadbed maintenance system and method
一种公路施工路基养护系统及方法
ZHOU LILI (Autor:in) / HUANG XIAOYU (Autor:in)
20.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Multifunctional roadbed maintenance device for road construction
Europäisches Patentamt | 2022
|Overhead roadbed structure, roadbed assembly, roadbed system and construction method
Europäisches Patentamt | 2020
|