Deep foundation pit slope support construction technology
The invention discloses a deep foundation pit slope support construction process which comprises the following steps: for a deep foundation pit slope formed by excavating earthwork, anchoring soil nails on the slope surface from top to bottom along the longitudinal direction of the slope; paving a support surface layer on the slope surface from top to bottom; steel wire ropes are arranged on the basis of the soil nails in the longitudinal direction and the transverse direction of the side slope, and the two ends of each steel wire rope are tensioned through steel wire rope traction winding equipment; a tension sensor is mounted on a steel wire rope arranged in the longitudinal direction of the slope; edge pressing anchoring treatment is conducted on the slope top and the slope bottom of the side slope; and deep foundation pit slope supporting is completed. The method is high in construction speed, controllable in quality, capable of effectively ensuring the stability of the deep foundation pit slope, environmentally friendly and suitable for popularization.
本发明公开了一种深基坑边坡支护施工工艺,包括:对开挖土方形成的深基坑边坡,沿边坡纵向方向,自上而下地在坡面上锚固好土钉;自上而下在边坡坡面上摊铺支护面层;沿边坡纵向方向和边坡横向方向,基于各土钉布设钢丝绳,钢丝绳两端通过钢丝绳牵引卷扬设备拉紧;在沿边坡纵向方向布设的钢丝绳上安装拉力传感器;在边坡的坡顶、坡底进行压边锚固处理;完成深基坑边坡支护。本发明施工速度快,质量可控,可有效确保深基坑边坡的稳定性,绿色环保,适于推广。
Deep foundation pit slope support construction technology
The invention discloses a deep foundation pit slope support construction process which comprises the following steps: for a deep foundation pit slope formed by excavating earthwork, anchoring soil nails on the slope surface from top to bottom along the longitudinal direction of the slope; paving a support surface layer on the slope surface from top to bottom; steel wire ropes are arranged on the basis of the soil nails in the longitudinal direction and the transverse direction of the side slope, and the two ends of each steel wire rope are tensioned through steel wire rope traction winding equipment; a tension sensor is mounted on a steel wire rope arranged in the longitudinal direction of the slope; edge pressing anchoring treatment is conducted on the slope top and the slope bottom of the side slope; and deep foundation pit slope supporting is completed. The method is high in construction speed, controllable in quality, capable of effectively ensuring the stability of the deep foundation pit slope, environmentally friendly and suitable for popularization.
本发明公开了一种深基坑边坡支护施工工艺,包括:对开挖土方形成的深基坑边坡,沿边坡纵向方向,自上而下地在坡面上锚固好土钉;自上而下在边坡坡面上摊铺支护面层;沿边坡纵向方向和边坡横向方向,基于各土钉布设钢丝绳,钢丝绳两端通过钢丝绳牵引卷扬设备拉紧;在沿边坡纵向方向布设的钢丝绳上安装拉力传感器;在边坡的坡顶、坡底进行压边锚固处理;完成深基坑边坡支护。本发明施工速度快,质量可控,可有效确保深基坑边坡的稳定性,绿色环保,适于推广。
Deep foundation pit slope support construction technology
一种深基坑边坡支护施工工艺
TAO LIANGLIANG (Autor:in) / LIU HAI (Autor:in) / WU QIANG (Autor:in) / WANG GUOWANG (Autor:in) / WANG YAMIN (Autor:in) / HUANG SONGGUANG (Autor:in) / GUO HAO (Autor:in) / ZHANG KUOCHENG (Autor:in) / ZHANG WENXUE (Autor:in)
20.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deep foundation pit slope structure type support construction method
Europäisches Patentamt | 2023
|Deep foundation pit soil and stone excavation and slope support construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Rock high slope deep foundation pit supporting construction method
Europäisches Patentamt | 2024
|Construction method of deep foundation pit under high slope condition
Europäisches Patentamt | 2023
|