Seamless leakage-proof construction method for basement exterior wall
The seamless leakage-proof construction method comprises the following steps that S1, multiple rows of inclined throwing supports used for supporting the wall of a foundation pit are sequentially installed from top to bottom, and after each row of inclined throwing supports are installed, back pressure soil corresponding to the row of inclined throwing supports is removed; s2, all back pressure soil in the foundation pit is removed, and all floors are sequentially constructed from bottom to top; before the outer wall of each floor is constructed, the inclined throwing support corresponding to the floor is dismantled, and a corresponding inclined throwing support hole is reserved in a bottom plate of the constructed floor; the corresponding inclined throwing support means that the inclined throwing support penetrates through the outer wall of the floor; and when the upper layer of the floor with the inclined throwing supports removed is constructed, the inclined throwing support holes are filled with concrete. According to the method, the inclined throwing support is firstly dismantled, and then the outer wall is constructed, so that the situation that inclined throwing support holes are reserved in the outer wall is avoided, the integrity of the outer wall structure is guaranteed, and the effect of preventing leakage is achieved.
本发明涉及一种地下室外墙无缝防漏的施工方法,包括以下步骤:S1、由上至下依次安装多排用于支撑基坑坑壁的斜抛撑,安装每排斜抛撑后,清除与该排斜抛撑对应的反压土;S2、清除所述基坑内所有的反压土,由底部向上依次对各楼层进行施工;每层楼层的外墙施工前,拆除所述楼层对应的斜抛撑,已经施工完成的楼层的底板上留有对应的斜抛撑孔;对应的斜抛撑是指斜抛撑穿过该楼层的外墙;对拆除斜抛撑后的楼层的上一层进行施工时,用混凝土对斜抛撑孔进行填补。本发明通过先拆除斜抛撑,再进行外墙的施工,以防止外墙上留有斜抛撑孔,保证外墙结构的整体性,以达到防止渗漏的效果。
Seamless leakage-proof construction method for basement exterior wall
The seamless leakage-proof construction method comprises the following steps that S1, multiple rows of inclined throwing supports used for supporting the wall of a foundation pit are sequentially installed from top to bottom, and after each row of inclined throwing supports are installed, back pressure soil corresponding to the row of inclined throwing supports is removed; s2, all back pressure soil in the foundation pit is removed, and all floors are sequentially constructed from bottom to top; before the outer wall of each floor is constructed, the inclined throwing support corresponding to the floor is dismantled, and a corresponding inclined throwing support hole is reserved in a bottom plate of the constructed floor; the corresponding inclined throwing support means that the inclined throwing support penetrates through the outer wall of the floor; and when the upper layer of the floor with the inclined throwing supports removed is constructed, the inclined throwing support holes are filled with concrete. According to the method, the inclined throwing support is firstly dismantled, and then the outer wall is constructed, so that the situation that inclined throwing support holes are reserved in the outer wall is avoided, the integrity of the outer wall structure is guaranteed, and the effect of preventing leakage is achieved.
本发明涉及一种地下室外墙无缝防漏的施工方法,包括以下步骤:S1、由上至下依次安装多排用于支撑基坑坑壁的斜抛撑,安装每排斜抛撑后,清除与该排斜抛撑对应的反压土;S2、清除所述基坑内所有的反压土,由底部向上依次对各楼层进行施工;每层楼层的外墙施工前,拆除所述楼层对应的斜抛撑,已经施工完成的楼层的底板上留有对应的斜抛撑孔;对应的斜抛撑是指斜抛撑穿过该楼层的外墙;对拆除斜抛撑后的楼层的上一层进行施工时,用混凝土对斜抛撑孔进行填补。本发明通过先拆除斜抛撑,再进行外墙的施工,以防止外墙上留有斜抛撑孔,保证外墙结构的整体性,以达到防止渗漏的效果。
Seamless leakage-proof construction method for basement exterior wall
一种地下室外墙无缝防漏的施工方法
CHEN CHAOJUN (Autor:in) / LIU HAILONG (Autor:in) / MO YONGWEI (Autor:in) / CHOCRON (Autor:in) / CHEN JINPEI (Autor:in) / XIAO QIANG (Autor:in) / HUANG FEIFEI (Autor:in) / ZHANG GUOLIN (Autor:in) / GONG YUANZHONG (Autor:in) / ZHOU WENLONG (Autor:in)
23.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Basement exterior wall and construction method thereof
Europäisches Patentamt | 2021
|Basement exterior wall and construction method thereof
Europäisches Patentamt | 2021
|