Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building demolition jacking equipment and construction method
The invention relates to the technical field of constructional engineering, in particular to building dismantling and jacking equipment and a construction method.The building dismantling and jacking equipment comprises a sliding rail, a jacking frame, a jacking mechanism, a fixed platform, a sliding base, a track plate, a dismantling equipment body, a first driving mechanism and a second driving mechanism; each sliding rail single body is detachably mounted on the outer side wall of a building; the jacking mechanism is used for driving the jacking frame to lift; the fixed platform is arranged at the upper end of the jacking frame, a boss is arranged on the fixed platform, the track plate is located on one side of the boss and used for making contact with the outer side wall of a building, the side, adjacent to the building, of the track plate is hinged to the fixed platform, and when the track plate is closed relative to the fixed platform, the upper end face of the track plate and the upper end face of the boss are matched to form a sliding way; and the dismounting equipment main body is detachably arranged on the sliding seat. According to the technical scheme, it is not needed to manually punch through holes in floors, and therefore the labor intensity of operators is reduced.
本发明涉及建筑工程技术领域,它涉及一种建筑物拆除顶升设备及施工方法,其中,建筑物拆除顶升设备包括滑轨、顶升架、顶升机构、固定平台、滑座、轨道板、拆卸设备主体、第一驱动机构和第二驱动机构;各滑轨单体均可拆卸地安装在建筑物的外侧壁;顶升机构用于驱动顶升架升降;固定平台设置在顶升架的上端,固定平台上设有凸台,轨道板位于凸台的一侧、且用于与建筑物的外侧壁相接触,轨道板与建筑物相邻的一侧与固定平台铰接,当轨道板相对固定平台闭合时,轨道板与凸台两者的上端面配合形成滑道;拆卸设备主体可拆卸地设置在滑座上。根据本发明的技术方案,其无需人工在楼层上打穿行孔,从而降低了作业人员的劳动强度。
Building demolition jacking equipment and construction method
The invention relates to the technical field of constructional engineering, in particular to building dismantling and jacking equipment and a construction method.The building dismantling and jacking equipment comprises a sliding rail, a jacking frame, a jacking mechanism, a fixed platform, a sliding base, a track plate, a dismantling equipment body, a first driving mechanism and a second driving mechanism; each sliding rail single body is detachably mounted on the outer side wall of a building; the jacking mechanism is used for driving the jacking frame to lift; the fixed platform is arranged at the upper end of the jacking frame, a boss is arranged on the fixed platform, the track plate is located on one side of the boss and used for making contact with the outer side wall of a building, the side, adjacent to the building, of the track plate is hinged to the fixed platform, and when the track plate is closed relative to the fixed platform, the upper end face of the track plate and the upper end face of the boss are matched to form a sliding way; and the dismounting equipment main body is detachably arranged on the sliding seat. According to the technical scheme, it is not needed to manually punch through holes in floors, and therefore the labor intensity of operators is reduced.
本发明涉及建筑工程技术领域,它涉及一种建筑物拆除顶升设备及施工方法,其中,建筑物拆除顶升设备包括滑轨、顶升架、顶升机构、固定平台、滑座、轨道板、拆卸设备主体、第一驱动机构和第二驱动机构;各滑轨单体均可拆卸地安装在建筑物的外侧壁;顶升机构用于驱动顶升架升降;固定平台设置在顶升架的上端,固定平台上设有凸台,轨道板位于凸台的一侧、且用于与建筑物的外侧壁相接触,轨道板与建筑物相邻的一侧与固定平台铰接,当轨道板相对固定平台闭合时,轨道板与凸台两者的上端面配合形成滑道;拆卸设备主体可拆卸地设置在滑座上。根据本发明的技术方案,其无需人工在楼层上打穿行孔,从而降低了作业人员的劳动强度。
Building demolition jacking equipment and construction method
一种建筑物拆除顶升设备及施工方法
HUANG YANGZHOU (Autor:in)
23.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building demolition inner jacking equipment and construction method
Europäisches Patentamt | 2023
|Old building reverse demolition method based on centralized control synchronous jacking system
Europäisches Patentamt | 2023
|Building structure top-down jacking equipment and jacking method
Europäisches Patentamt | 2024
|