Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Anti-seepage construction method for post-cast strip of basement bottom plate
The invention relates to the technical field of basement water leakage protection, in particular to a basement bottom plate post-cast strip anti-seepage construction method which comprises the following steps that the position of a post-cast strip is determined; a bottom plate pouring step: pouring a foundation bottom plate in a basement, and reserving a gap according to a place where the position of a post-pouring belt is determined in advance; underground excavation is conducted before pouring of the post-cast strip, specifically, a sunken groove is excavated below the position, where the vacancy is reserved, of the post-cast strip; a precipitation ditch excavation step: excavating a precipitation ditch on the ground right below the vacant position of the reserved post-cast strip, laying a drainage pipe in the precipitation ditch, forming a water inlet hole in the upper pipe wall of the drainage pipe, and communicating the drainage pipe with a sewer; drainage and drainage: arranging a water conduit between the sunken groove and the drainage pipe; construction of water collection in the sunken groove: installing a water collection device in the sunken groove; and a post-cast strip pouring step. The method has the effect of improving the leakage problem at the post-cast strip of the basement bottom plate.
本申请涉及一种地下室底板后浇带防渗漏施工方法,涉及地下室漏水防护的技术领域,其包括以下步骤:后浇带位置确定步骤;底板浇筑步骤:在地下室进行基础底板的浇筑,根据提前确定好后浇带位置的地方留出空缺;后浇带浇筑前地下开挖步骤:在后浇带留出空缺位置的下面以下进行开挖下沉式凹槽;降水沟开挖步骤:在预留后浇带的空缺位置的正下方地面开挖出降水沟,在降水沟内铺设排水管,排水管的上管壁开设入水孔,排水管与下水道连通;排水引流步骤:在下沉式凹槽与排水管之间设置引水管;下沉式凹槽内集水施工步骤:在下沉式凹槽内安装集水装置;后浇带浇筑步骤。本申请具有改善地下室底板后浇带处的渗漏问题的效果。
Anti-seepage construction method for post-cast strip of basement bottom plate
The invention relates to the technical field of basement water leakage protection, in particular to a basement bottom plate post-cast strip anti-seepage construction method which comprises the following steps that the position of a post-cast strip is determined; a bottom plate pouring step: pouring a foundation bottom plate in a basement, and reserving a gap according to a place where the position of a post-pouring belt is determined in advance; underground excavation is conducted before pouring of the post-cast strip, specifically, a sunken groove is excavated below the position, where the vacancy is reserved, of the post-cast strip; a precipitation ditch excavation step: excavating a precipitation ditch on the ground right below the vacant position of the reserved post-cast strip, laying a drainage pipe in the precipitation ditch, forming a water inlet hole in the upper pipe wall of the drainage pipe, and communicating the drainage pipe with a sewer; drainage and drainage: arranging a water conduit between the sunken groove and the drainage pipe; construction of water collection in the sunken groove: installing a water collection device in the sunken groove; and a post-cast strip pouring step. The method has the effect of improving the leakage problem at the post-cast strip of the basement bottom plate.
本申请涉及一种地下室底板后浇带防渗漏施工方法,涉及地下室漏水防护的技术领域,其包括以下步骤:后浇带位置确定步骤;底板浇筑步骤:在地下室进行基础底板的浇筑,根据提前确定好后浇带位置的地方留出空缺;后浇带浇筑前地下开挖步骤:在后浇带留出空缺位置的下面以下进行开挖下沉式凹槽;降水沟开挖步骤:在预留后浇带的空缺位置的正下方地面开挖出降水沟,在降水沟内铺设排水管,排水管的上管壁开设入水孔,排水管与下水道连通;排水引流步骤:在下沉式凹槽与排水管之间设置引水管;下沉式凹槽内集水施工步骤:在下沉式凹槽内安装集水装置;后浇带浇筑步骤。本申请具有改善地下室底板后浇带处的渗漏问题的效果。
Anti-seepage construction method for post-cast strip of basement bottom plate
一种地下室底板后浇带防渗漏施工方法
WANG JUNPENG (Autor:in) / SUN WEICHAO (Autor:in) / WANG ZHIPENG (Autor:in) / REN QIANG (Autor:in) / LEE SE-LIN (Autor:in) / XU HAIXING (Autor:in) / ZHANG YUECHEN (Autor:in) / YU CHENGYANG (Autor:in) / YU LONGLONG (Autor:in) / SON JONG-HO (Autor:in)
27.12.2022
Patent
Elektronische Ressource
Chinesisch
Basement bottom plate post-cast strip anti-seepage system
Europäisches Patentamt | 2023
|Basement post-cast strip anti-seepage construction tool
Europäisches Patentamt | 2024
|Basement top plate post-cast strip multiple anti-seepage construction technology
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Basement bottom plate post-cast strip dewatering construction method
Europäisches Patentamt | 2024
|