Cross three-dimensional channel pre-reinforcing and holing construction method
The invention discloses a crossed three-dimensional channel pre-reinforcing and holing construction method, which relates to the field of building construction, and adopts the technical scheme that the method comprises the following steps: S1, reinforcing a soil body behind a pile; s2, a channel steel cross support is arranged above the pre-formed hole; s3, integrally reinforcing the pile body at the upper part of the hole; s4, breaking the hole; s5, the double-row steel beams of the cut pile body are transversely supported and reinforced; s6, steel stand columns are erected; s7, breaking the pile body; s8, backfilling is conducted; s9, upper layer communication construction; s10, cutting off and reinforcing the part, communicated with the connection port, of the pile body on the upper side; and S11, breaking the wall body. The construction method has the beneficial effects that the lower structure is constructed firstly and then the upper structure is constructed in a manner of'bottom-up '; firstly supporting and then dismantling are conducted, supporting is conducted firstly before dismantling, and then the piles are dismantled on the premise that safety is guaranteed; and reinforcing is conducted synchronously, after the pile foundation is dismantled, reinforcing is conducted at the same time, and construction safety is guaranteed.
本发明公开了一种交叉立体式通道预加固及开洞施工方法,涉及建筑施工领域,技术方案为,包括S1、桩后土体加固;S2、预开洞口上方设置槽钢交叉支撑;S3、洞口上部桩体整体加固;S4、洞口破除;S5、对已切除的桩体双排型钢梁横向支护加固;S6、支设钢立柱;S7、桩体破除;S8、回填;S9、上层连通施工;S10、上侧连通接驳口部分桩体切除并加固;S11、破除墙体。本发明的有益效果是:采用“先下后上”,先进行下层结构的施工,再进行上部结构施工;“先支后拆”,在拆除之前先进行支护,保证安全的前提下再进行桩的拆除;“加固同步”,在拆除桩基后,同时进行加固,保证施工安全。
Cross three-dimensional channel pre-reinforcing and holing construction method
The invention discloses a crossed three-dimensional channel pre-reinforcing and holing construction method, which relates to the field of building construction, and adopts the technical scheme that the method comprises the following steps: S1, reinforcing a soil body behind a pile; s2, a channel steel cross support is arranged above the pre-formed hole; s3, integrally reinforcing the pile body at the upper part of the hole; s4, breaking the hole; s5, the double-row steel beams of the cut pile body are transversely supported and reinforced; s6, steel stand columns are erected; s7, breaking the pile body; s8, backfilling is conducted; s9, upper layer communication construction; s10, cutting off and reinforcing the part, communicated with the connection port, of the pile body on the upper side; and S11, breaking the wall body. The construction method has the beneficial effects that the lower structure is constructed firstly and then the upper structure is constructed in a manner of'bottom-up '; firstly supporting and then dismantling are conducted, supporting is conducted firstly before dismantling, and then the piles are dismantled on the premise that safety is guaranteed; and reinforcing is conducted synchronously, after the pile foundation is dismantled, reinforcing is conducted at the same time, and construction safety is guaranteed.
本发明公开了一种交叉立体式通道预加固及开洞施工方法,涉及建筑施工领域,技术方案为,包括S1、桩后土体加固;S2、预开洞口上方设置槽钢交叉支撑;S3、洞口上部桩体整体加固;S4、洞口破除;S5、对已切除的桩体双排型钢梁横向支护加固;S6、支设钢立柱;S7、桩体破除;S8、回填;S9、上层连通施工;S10、上侧连通接驳口部分桩体切除并加固;S11、破除墙体。本发明的有益效果是:采用“先下后上”,先进行下层结构的施工,再进行上部结构施工;“先支后拆”,在拆除之前先进行支护,保证安全的前提下再进行桩的拆除;“加固同步”,在拆除桩基后,同时进行加固,保证施工安全。
Cross three-dimensional channel pre-reinforcing and holing construction method
一种交叉立体式通道预加固及开洞施工方法
HAN JIANYONG (Autor:in) / ZHAO MINGCHENG (Autor:in) / LIU DONG (Autor:in) / CAO JIAWEI (Autor:in) / WANG QINGHAI (Autor:in) / YU HAO (Autor:in) / WANG JUN (Autor:in) / NING BINGZHENG (Autor:in) / ZHANG SEN (Autor:in) / CUI ZHONGQUAN (Autor:in)
27.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2022
|Reinforcing system for shear wall rear holing and rear holing method thereof
Europäisches Patentamt | 2024
|Municipal garden landscape house old enclosure wall body reinforcing structure and holing method
Europäisches Patentamt | 2021
|Prestressed floor holing auxiliary device and construction method