Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rail transit infrastructure construction platform and use method thereof
The invention relates to the technical field of rail transit construction, in particular to a rail transit infrastructure construction platform and a using method thereof. A mounting frame is arranged at the front end of the body, a mounting plate is located on the lower portion of the front end of the mounting frame, a pushing plate is arranged at the front end of the mounting plate, the front of the pushing plate is of a slope structure, a hopper is fixed to the mounting frame through a positioning frame, a plugging device is arranged below the hopper, and a discharging port of the hopper is located in front of the pushing plate. According to the structure of the plugging device, a guide ring is fixed to the bottom of a hopper through a guide frame, a lifting sliding frame penetrates through the guide ring to be fixed to a spherical plugging head, an annular base is arranged below the hopper, arc-shaped elastic pieces are evenly arranged on the outer wall of the annular base, the shapes of the arc-shaped elastic pieces correspond to those of the spherical plugging head, and a fixing ring is arranged on the lifting sliding frame. A second spring is arranged between the fixing ring and the guide ring, and a detection wheel is arranged at the bottom of the lifting sliding frame.
本发明涉及轨道交通建设技术领域,尤其涉及一种轨道交通基础设施建设平台及其使用方法。主体前端设有安装架,安装板位于安装架前端下部,安装板前端设有推料板,推料板的前方为斜面结构,料斗通过定位架与安装架固定,料斗下方设有封堵装置,料斗的出料口位于推料板前方。封堵装置的结构包括,导向环通过导向架与料斗底部固定,升降滑架穿过导向环与球形封堵头固定,料斗下方设有环形座,环形座外壁上均匀设有弧形弹片,弧形弹片的形状与球形封堵头对应,升降滑架上设有固定环,固定环与导向环之间设有第二弹簧,升降滑架底部设有探轮。
Rail transit infrastructure construction platform and use method thereof
The invention relates to the technical field of rail transit construction, in particular to a rail transit infrastructure construction platform and a using method thereof. A mounting frame is arranged at the front end of the body, a mounting plate is located on the lower portion of the front end of the mounting frame, a pushing plate is arranged at the front end of the mounting plate, the front of the pushing plate is of a slope structure, a hopper is fixed to the mounting frame through a positioning frame, a plugging device is arranged below the hopper, and a discharging port of the hopper is located in front of the pushing plate. According to the structure of the plugging device, a guide ring is fixed to the bottom of a hopper through a guide frame, a lifting sliding frame penetrates through the guide ring to be fixed to a spherical plugging head, an annular base is arranged below the hopper, arc-shaped elastic pieces are evenly arranged on the outer wall of the annular base, the shapes of the arc-shaped elastic pieces correspond to those of the spherical plugging head, and a fixing ring is arranged on the lifting sliding frame. A second spring is arranged between the fixing ring and the guide ring, and a detection wheel is arranged at the bottom of the lifting sliding frame.
本发明涉及轨道交通建设技术领域,尤其涉及一种轨道交通基础设施建设平台及其使用方法。主体前端设有安装架,安装板位于安装架前端下部,安装板前端设有推料板,推料板的前方为斜面结构,料斗通过定位架与安装架固定,料斗下方设有封堵装置,料斗的出料口位于推料板前方。封堵装置的结构包括,导向环通过导向架与料斗底部固定,升降滑架穿过导向环与球形封堵头固定,料斗下方设有环形座,环形座外壁上均匀设有弧形弹片,弧形弹片的形状与球形封堵头对应,升降滑架上设有固定环,固定环与导向环之间设有第二弹簧,升降滑架底部设有探轮。
Rail transit infrastructure construction platform and use method thereof
一种轨道交通基础设施建设平台及其使用方法
SONG ZHUORUI (Autor:in) / YIN YUE (Autor:in) / ZHANG LEI (Autor:in) / ZHAO CHENGYAO (Autor:in) / LIU CHENGZHE (Autor:in) / LI YAOLIANG (Autor:in) / CHEN YIWEN (Autor:in) / ZOU XINYANG (Autor:in) / LYU WEIHAO (Autor:in) / ZHU LIYAN (Autor:in)
03.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail transit infrastructure construction platform and design method thereof
Europäisches Patentamt | 2023
|Rail transit fabricated platform plate structure and construction method thereof
Europäisches Patentamt | 2021
|Method for installing construction platform of rail transit elevated station
Europäisches Patentamt | 2015
|