Layered soil paving and pressing system and paving and pressing method for geotechnical engineering
The layer soil paving and pressing system comprises a road rolling vehicle, a material pushing mechanism, a shielding mechanism and a material pushing mechanism, the shielding mechanism is arranged at the end of the road rolling vehicle and located in front of the material pushing mechanism, and the material pushing mechanism comprises a supporting plate, a first motor, a first lead screw, a first guide column, a first guide sleeve, a second guide sleeve and a material pushing shell. A shifting assembly is arranged at the top of the end of the road rolling vehicle, the shielding mechanism is installed on the shifting assembly, the shifting assembly can drive the shielding mechanism to move left and right, the shielding mechanism comprises a shielding assembly, and when layer soil laying is conducted on the ground, if a well lid is arranged on the ground, materials are placed on the ground, then the road rolling vehicle drives the shielding assembly to move, and the shielding assembly can shield the materials. And then a third motor drives a third lead screw to rotate, so that a shifting plate is driven to move downwards, the blocking column is driven to move downwards, the bottom of the blocking column makes contact with the well lid, and therefore the well lid is blocked.
本发明公布了一种用于岩土工程中的层土铺压系统及铺压方法,其包括,压路车、推料机构、遮护机构,推料机构、遮护机构设置于压路车的端部,遮护机构处于推料机构的前方,推料机构包括支撑板、电机一、丝杆一、导柱一、导套一、导套二、推料壳体,压路车端部的顶部设置有移位组件,所述的遮护机构安装于移位组件上,移位组件能够驱动遮护机构左右移动,所述的遮护机构包括遮挡组件,当对地面进行层土铺设时,若地面上设有井盖时,物料置于地面上,接着压路车驱动遮挡组件移动,从而使挡柱处于井盖的正上方,接着电机三带动丝杆三转动,从而带动移位板下移,从而带动挡柱下移,从而使挡柱的底部与井盖接触,从而对井盖进行遮挡。
Layered soil paving and pressing system and paving and pressing method for geotechnical engineering
The layer soil paving and pressing system comprises a road rolling vehicle, a material pushing mechanism, a shielding mechanism and a material pushing mechanism, the shielding mechanism is arranged at the end of the road rolling vehicle and located in front of the material pushing mechanism, and the material pushing mechanism comprises a supporting plate, a first motor, a first lead screw, a first guide column, a first guide sleeve, a second guide sleeve and a material pushing shell. A shifting assembly is arranged at the top of the end of the road rolling vehicle, the shielding mechanism is installed on the shifting assembly, the shifting assembly can drive the shielding mechanism to move left and right, the shielding mechanism comprises a shielding assembly, and when layer soil laying is conducted on the ground, if a well lid is arranged on the ground, materials are placed on the ground, then the road rolling vehicle drives the shielding assembly to move, and the shielding assembly can shield the materials. And then a third motor drives a third lead screw to rotate, so that a shifting plate is driven to move downwards, the blocking column is driven to move downwards, the bottom of the blocking column makes contact with the well lid, and therefore the well lid is blocked.
本发明公布了一种用于岩土工程中的层土铺压系统及铺压方法,其包括,压路车、推料机构、遮护机构,推料机构、遮护机构设置于压路车的端部,遮护机构处于推料机构的前方,推料机构包括支撑板、电机一、丝杆一、导柱一、导套一、导套二、推料壳体,压路车端部的顶部设置有移位组件,所述的遮护机构安装于移位组件上,移位组件能够驱动遮护机构左右移动,所述的遮护机构包括遮挡组件,当对地面进行层土铺设时,若地面上设有井盖时,物料置于地面上,接着压路车驱动遮挡组件移动,从而使挡柱处于井盖的正上方,接着电机三带动丝杆三转动,从而带动移位板下移,从而带动挡柱下移,从而使挡柱的底部与井盖接触,从而对井盖进行遮挡。
Layered soil paving and pressing system and paving and pressing method for geotechnical engineering
一种用于岩土工程中的层土铺压系统及铺压方法
CHEN HANG (Autor:in) / YAO ZHANWEI (Autor:in)
03.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Pressing machine for highway subgrade pavement paving