Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a line drawing device, in particular to a positioning line drawing device for a construction site. The positioning line drawing device for the construction site is high in line drawing qualification rate. A positioning line drawing device for a construction site comprises a guide sleeve, a first tension spring, a line drawing pen, a telescopic frame, a vertical line drawing mechanism and a veneering mechanism. The right portion in the guide sleeve is connected with a first tension spring, the left side of the first tension spring is connected with a line drawing pen, the line drawing pen is slidably connected with the guide sleeve, the vertical line drawing mechanism is connected with a telescopic frame, the guide sleeve is rotatably connected with the telescopic frame, and the vertical line drawing mechanism is connected with a veneering mechanism. According to the line drawing device, the first sliding rail is placed on the plane by people, so that the first suction cup and the second suction cup are in a straight line, then people manually move the handle frame, the line drawing pen conducts line drawing on the plane, and therefore the line drawing effect is achieved, and the qualified rate of line drawing is high.
本发明涉及一种画线装置,尤其涉及一种建筑工地定位画线装置。本发明提供一种画线合格率较高的建筑工地定位画线装置。一种建筑工地定位画线装置,包括有导套、第一拉力弹簧、画线笔、伸缩架、竖直画线机构和贴面机构;导套内右部连接有第一拉力弹簧,第一拉力弹簧左侧连接有画线笔,画线笔与导套滑动式连接,竖直画线机构上连接有伸缩架,导套与伸缩架转动式连接,竖直画线机构上连接有贴面机构。本发明通过人们将第一滑轨放置在平面上,使得第一吸盘和第二吸盘呈一条直线,随后人们手动移动手柄架,使得画线笔在平面上进行画线,以此实现了画线的效果,使得画线的合格率较高。
The invention relates to a line drawing device, in particular to a positioning line drawing device for a construction site. The positioning line drawing device for the construction site is high in line drawing qualification rate. A positioning line drawing device for a construction site comprises a guide sleeve, a first tension spring, a line drawing pen, a telescopic frame, a vertical line drawing mechanism and a veneering mechanism. The right portion in the guide sleeve is connected with a first tension spring, the left side of the first tension spring is connected with a line drawing pen, the line drawing pen is slidably connected with the guide sleeve, the vertical line drawing mechanism is connected with a telescopic frame, the guide sleeve is rotatably connected with the telescopic frame, and the vertical line drawing mechanism is connected with a veneering mechanism. According to the line drawing device, the first sliding rail is placed on the plane by people, so that the first suction cup and the second suction cup are in a straight line, then people manually move the handle frame, the line drawing pen conducts line drawing on the plane, and therefore the line drawing effect is achieved, and the qualified rate of line drawing is high.
本发明涉及一种画线装置,尤其涉及一种建筑工地定位画线装置。本发明提供一种画线合格率较高的建筑工地定位画线装置。一种建筑工地定位画线装置,包括有导套、第一拉力弹簧、画线笔、伸缩架、竖直画线机构和贴面机构;导套内右部连接有第一拉力弹簧,第一拉力弹簧左侧连接有画线笔,画线笔与导套滑动式连接,竖直画线机构上连接有伸缩架,导套与伸缩架转动式连接,竖直画线机构上连接有贴面机构。本发明通过人们将第一滑轨放置在平面上,使得第一吸盘和第二吸盘呈一条直线,随后人们手动移动手柄架,使得画线笔在平面上进行画线,以此实现了画线的效果,使得画线的合格率较高。
Line drawing positioning construction process for building curtain wall mounting
Europäisches Patentamt | 2020
|