Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a bridge inhaul cable anti-corrosion construction device and method, and relates to the field of bridge inhaul cable anti-corrosion, the bridge inhaul cable anti-corrosion construction device comprises a detection robot, the detection robot comprises a film covering mechanism, a clamping mechanism, a cutting mechanism and a film locking mechanism, and the film locking mechanism comprises a fixing frame, a pressing part arranged on the fixing frame and a hot melting part arranged on the fixing frame; the fixing frame is used for being connected to a detection robot to move along with the detection robot in the length direction of the inhaul cable, the pressing part is used for wrapping the inhaul cable with the protective belt, the hot melting part is used for fusing the two sides of the protective belt in the length direction, the inhaul cable is wrapped with the protective belt, and the possibility that the bridge inhaul cable is corroded is reduced.
本申请公开了一种桥梁拉索防腐蚀施工装置及施工方法,涉及桥梁拉索防腐蚀领域,其包括检测机器人、包括覆膜机构、夹持机构、切断机构和锁膜机构,锁膜机构包括固定架、设置在固定架上的压紧部件和设置在固定架上的热熔部件,固定架用于连接在检测机器人上以跟随检测机器人沿拉索长度方向移动,压紧部件用于将防护带包覆在拉索外,热熔部件用于将防护带长度方向的两侧熔合,本申请本申请通过防护带将拉索包覆,降低桥梁拉索被腐蚀的可能性。
The invention discloses a bridge inhaul cable anti-corrosion construction device and method, and relates to the field of bridge inhaul cable anti-corrosion, the bridge inhaul cable anti-corrosion construction device comprises a detection robot, the detection robot comprises a film covering mechanism, a clamping mechanism, a cutting mechanism and a film locking mechanism, and the film locking mechanism comprises a fixing frame, a pressing part arranged on the fixing frame and a hot melting part arranged on the fixing frame; the fixing frame is used for being connected to a detection robot to move along with the detection robot in the length direction of the inhaul cable, the pressing part is used for wrapping the inhaul cable with the protective belt, the hot melting part is used for fusing the two sides of the protective belt in the length direction, the inhaul cable is wrapped with the protective belt, and the possibility that the bridge inhaul cable is corroded is reduced.
本申请公开了一种桥梁拉索防腐蚀施工装置及施工方法,涉及桥梁拉索防腐蚀领域,其包括检测机器人、包括覆膜机构、夹持机构、切断机构和锁膜机构,锁膜机构包括固定架、设置在固定架上的压紧部件和设置在固定架上的热熔部件,固定架用于连接在检测机器人上以跟随检测机器人沿拉索长度方向移动,压紧部件用于将防护带包覆在拉索外,热熔部件用于将防护带长度方向的两侧熔合,本申请本申请通过防护带将拉索包覆,降低桥梁拉索被腐蚀的可能性。
Bridge inhaul cable anti-corrosion construction device and construction method
一种桥梁拉索防腐蚀施工装置及施工方法
DING YANG (Autor:in)
06.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Inhaul cable connecting structure for cable-stayed bridge construction
Europäisches Patentamt | 2024
|Inhaul cable releasing device for cable-stayed bridge construction and using method
Europäisches Patentamt | 2023
|Inhaul cable anchoring device for cable-stayed bridge and tensioning construction method
Europäisches Patentamt | 2024
|