Permanent and temporary combined logistics channel in oversized foundation pit
The permanent and temporary combined logistics channel in the oversized foundation pit comprises a foundation pit body and a plurality of tubular piles arranged on the foundation pit body, a channel layer is arranged on the foundation pit body, each tubular pile is fixedly connected with a fixing sleeve, each tubular pile is provided with a cover plate, and the cover plates are fixedly connected with the channel layer. The cover plate is provided with two openings which are symmetrically arranged; each fixing sleeve is provided with two mounting cavities, each mounting cavity is internally connected with a T-shaped block through a torsion spring, and each fixing sleeve is provided with two sliding assemblies. When the foundation slab layer in the foundation pit body needs to be constructed, only the cover plate needs to be dismantled, then the foundation slab layer is further constructed on the basis of the channel layer, the channel layer does not need to be broken, heavy construction of cleaning is not needed either, the construction progress is accelerated, and meanwhile the construction cost is reduced.
本发明公开了一种超大基坑内永临结合的物流通道,包括基坑本体以及设置在所述基坑本体上的多个管桩,所述基坑本体上设置有通道层,每个所述管桩上均固定连接有固定套,每个所述管桩上均设置有盖板,所述盖板上开设有两个呈对称设置的开口;每个所述固定套上均开设有两个安装腔,每个所述安装腔内通过扭转弹簧连接有T形块,每个所述固定套上均设置有两个滑动组件。本发明当需要对基坑本体内的基础底板层进行施工时,只需将盖板拆除,之后在通道层的基础上进一步施工基础底板层即可,不需要对通道层进行破除,也不需要进行清理的繁重施工,加快了施工进度,同时也降低了施工的成本。
Permanent and temporary combined logistics channel in oversized foundation pit
The permanent and temporary combined logistics channel in the oversized foundation pit comprises a foundation pit body and a plurality of tubular piles arranged on the foundation pit body, a channel layer is arranged on the foundation pit body, each tubular pile is fixedly connected with a fixing sleeve, each tubular pile is provided with a cover plate, and the cover plates are fixedly connected with the channel layer. The cover plate is provided with two openings which are symmetrically arranged; each fixing sleeve is provided with two mounting cavities, each mounting cavity is internally connected with a T-shaped block through a torsion spring, and each fixing sleeve is provided with two sliding assemblies. When the foundation slab layer in the foundation pit body needs to be constructed, only the cover plate needs to be dismantled, then the foundation slab layer is further constructed on the basis of the channel layer, the channel layer does not need to be broken, heavy construction of cleaning is not needed either, the construction progress is accelerated, and meanwhile the construction cost is reduced.
本发明公开了一种超大基坑内永临结合的物流通道,包括基坑本体以及设置在所述基坑本体上的多个管桩,所述基坑本体上设置有通道层,每个所述管桩上均固定连接有固定套,每个所述管桩上均设置有盖板,所述盖板上开设有两个呈对称设置的开口;每个所述固定套上均开设有两个安装腔,每个所述安装腔内通过扭转弹簧连接有T形块,每个所述固定套上均设置有两个滑动组件。本发明当需要对基坑本体内的基础底板层进行施工时,只需将盖板拆除,之后在通道层的基础上进一步施工基础底板层即可,不需要对通道层进行破除,也不需要进行清理的繁重施工,加快了施工进度,同时也降低了施工的成本。
Permanent and temporary combined logistics channel in oversized foundation pit
一种超大基坑内永临结合的物流通道
WANG FUQIANG (Autor:in) / ZHAO XIN (Autor:in) / SHI YONGJIE (Autor:in) / HAN XUEGANG (Autor:in) / ZHANG YANQIU (Autor:in) / ZHENG XUEMEI (Autor:in) / YANG ZONGZHENG (Autor:in) / LI XIHUI (Autor:in) / GUO FEI (Autor:in) / WANG KAILI (Autor:in)
13.01.2023
Patent
Elektronische Ressource
Chinesisch
Permanent and temporary combined box culvert foundation reinforcing structure
Europäisches Patentamt | 2021
|Permanent and temporary combined rear bolt type construction hoist foundation
Europäisches Patentamt | 2024
|Permanent and temporary combined tower crane foundation and construction method thereof
Europäisches Patentamt | 2022
|Foundation with oversized hydraulic machine replacing underbeam
Europäisches Patentamt | 2024
|