Intelligent splicing method for green building curtain wall
The invention discloses a green building curtain wall intelligent splicing method in the technical field of green buildings, and the method comprises the following specific steps: embedding embedded parts into concrete according to a proper distance, finding out the embedded parts before use, and knocking out the embedded parts; an installation worker assembles the curtain wall frame indoors, and fixes the assembled curtain wall frame on a wall body through an embedded part; the curtain wall plate is moved to a floor with the appropriate height of the curtain wall frame needing to be installed from the indoor space, and then the curtain wall plate is fixed through the curtain wall frame and transferred to the outdoor space; the curtain wall frame limits and fixes the curtain wall plates, and the operation is repeated until all curtain walls are installed; wherein in the second step, a curtain wall frame comprises two transverse plates, each transverse plate is fixed to an embedded part through a bolt, rotating shafts are rotationally connected to the two sides of each transverse plate, and when the curtain wall plate is located outdoors, the curtain wall plate is supported by a mounting frame, so that the curtain wall plate does not need to be supported by multiple workers, and the outdoor high-altitude working time of the workers is shortened.
本发明公开了绿色建筑技术领域的一种绿色建筑幕墙智能拼装方法,该方法的具体步骤如下:将预埋件按合适的距离埋入混凝土中,并在使用前找到预埋件并且敲出;安装工人在室内将幕墙框架组装,并且将组件好的幕墙框架通过预埋件固定在墙体上;将幕墙板从室内移动至需要安装的幕墙框架合适高度的楼层,再通过幕墙框架将幕墙板固定并且转移至室外;幕墙框架对幕墙板进行限位与固定,重复操作,直至完成全部幕墙的安装;其中步骤二中幕墙框架包括两个横板,每个横板均通过螺栓与预埋件固定,每个横板两侧均转动连接有转轴,当幕墙板处于室外时,幕墙板已经有安装架进行支撑,不仅无需多名工人对其进行扶持,还降低了工人室外高空工作的时间。
Intelligent splicing method for green building curtain wall
The invention discloses a green building curtain wall intelligent splicing method in the technical field of green buildings, and the method comprises the following specific steps: embedding embedded parts into concrete according to a proper distance, finding out the embedded parts before use, and knocking out the embedded parts; an installation worker assembles the curtain wall frame indoors, and fixes the assembled curtain wall frame on a wall body through an embedded part; the curtain wall plate is moved to a floor with the appropriate height of the curtain wall frame needing to be installed from the indoor space, and then the curtain wall plate is fixed through the curtain wall frame and transferred to the outdoor space; the curtain wall frame limits and fixes the curtain wall plates, and the operation is repeated until all curtain walls are installed; wherein in the second step, a curtain wall frame comprises two transverse plates, each transverse plate is fixed to an embedded part through a bolt, rotating shafts are rotationally connected to the two sides of each transverse plate, and when the curtain wall plate is located outdoors, the curtain wall plate is supported by a mounting frame, so that the curtain wall plate does not need to be supported by multiple workers, and the outdoor high-altitude working time of the workers is shortened.
本发明公开了绿色建筑技术领域的一种绿色建筑幕墙智能拼装方法,该方法的具体步骤如下:将预埋件按合适的距离埋入混凝土中,并在使用前找到预埋件并且敲出;安装工人在室内将幕墙框架组装,并且将组件好的幕墙框架通过预埋件固定在墙体上;将幕墙板从室内移动至需要安装的幕墙框架合适高度的楼层,再通过幕墙框架将幕墙板固定并且转移至室外;幕墙框架对幕墙板进行限位与固定,重复操作,直至完成全部幕墙的安装;其中步骤二中幕墙框架包括两个横板,每个横板均通过螺栓与预埋件固定,每个横板两侧均转动连接有转轴,当幕墙板处于室外时,幕墙板已经有安装架进行支撑,不仅无需多名工人对其进行扶持,还降低了工人室外高空工作的时间。
Intelligent splicing method for green building curtain wall
一种绿色建筑幕墙智能拼装方法
TANG ZHENTAO (Autor:in) / ZHANG BO (Autor:in) / PENG DIHANG (Autor:in)
17.01.2023
Patent
Elektronische Ressource
Chinesisch