Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of ponding-preventing artificial turf
The construction method comprises the following steps that S1, the artificial turf is manufactured, specifically, the artificial turf comprises a rebound resilience bearing net plate, a water guide groove cement prefabricated part and a turf body, the rebound resilience bearing net plate is made of a polyformaldehyde material, a plurality of water guide holes are distributed in the surface of the rebound resilience bearing net plate, and the water guide groove cement prefabricated part is made of a polyformaldehyde material; reinforcing beams are distributed on the bottom face of the rebound bearing net plate, and net plate limiting holes and lawn limiting holes are formed in the surface of the rebound bearing net plate. The water guide groove cement prefabricated part is of a cuboid structure, and an arc-shaped water guide groove is formed in the surface of the cuboid. S2, foundation treatment; s3, laying a cement prefabricated part of the water chute; s4, a drainage ditch is excavated; s5, creating a rebound resilience bearing platform; s6, laying a lawn body; and step S7, bonding the adjacent lawn bodies. The problem of water accumulation can be thoroughly solved, and the method has the advantages of being short in construction period and high in construction efficiency.
本发明公开了一种防积水人造草坪的施工方法,包括以下步骤:步骤S1、人造草坪的制作:人造草坪包括回弹性承载网板、导水槽水泥预制件和草坪本体,其中,回弹性承载网板是赛钢材料制成,在回弹性承载网板的表面分布有多个导水孔,在回弹性承载网板的底面上分布有加强梁,在回弹性承载网板的表面设有网板限位孔和草坪限位孔;导水槽水泥预制件为长方体结构,在长方体的表面设有弧形的导水槽;步骤S2、地基处理;步骤S3、铺设导水槽水泥预制件;步骤S4、开挖排水沟;步骤S5、创建回弹性承载台;步骤S6、铺设草坪本体;步骤S7、相邻草坪本体间的粘接。能彻底解决积水的问题,并具有施工周期短,施工效率高的特点。
Construction method of ponding-preventing artificial turf
The construction method comprises the following steps that S1, the artificial turf is manufactured, specifically, the artificial turf comprises a rebound resilience bearing net plate, a water guide groove cement prefabricated part and a turf body, the rebound resilience bearing net plate is made of a polyformaldehyde material, a plurality of water guide holes are distributed in the surface of the rebound resilience bearing net plate, and the water guide groove cement prefabricated part is made of a polyformaldehyde material; reinforcing beams are distributed on the bottom face of the rebound bearing net plate, and net plate limiting holes and lawn limiting holes are formed in the surface of the rebound bearing net plate. The water guide groove cement prefabricated part is of a cuboid structure, and an arc-shaped water guide groove is formed in the surface of the cuboid. S2, foundation treatment; s3, laying a cement prefabricated part of the water chute; s4, a drainage ditch is excavated; s5, creating a rebound resilience bearing platform; s6, laying a lawn body; and step S7, bonding the adjacent lawn bodies. The problem of water accumulation can be thoroughly solved, and the method has the advantages of being short in construction period and high in construction efficiency.
本发明公开了一种防积水人造草坪的施工方法,包括以下步骤:步骤S1、人造草坪的制作:人造草坪包括回弹性承载网板、导水槽水泥预制件和草坪本体,其中,回弹性承载网板是赛钢材料制成,在回弹性承载网板的表面分布有多个导水孔,在回弹性承载网板的底面上分布有加强梁,在回弹性承载网板的表面设有网板限位孔和草坪限位孔;导水槽水泥预制件为长方体结构,在长方体的表面设有弧形的导水槽;步骤S2、地基处理;步骤S3、铺设导水槽水泥预制件;步骤S4、开挖排水沟;步骤S5、创建回弹性承载台;步骤S6、铺设草坪本体;步骤S7、相邻草坪本体间的粘接。能彻底解决积水的问题,并具有施工周期短,施工效率高的特点。
Construction method of ponding-preventing artificial turf
一种防积水人造草坪的施工方法
WAN XINWEI (Autor:in)
24.01.2023
Patent
Elektronische Ressource
Chinesisch
Anti-icing artificial turf and construction method of artificial turf
Europäisches Patentamt | 2022
|ARTIFICIAL TURF CONSTRUCTION STRUCTURE INCLUDING ARTIFICIAL TURF FILLER
Europäisches Patentamt | 2022
|ARTIFICIAL TURF UNIT, ARTIFICIAL TURF FACILITY AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
|