Jacking pouring method for concrete filled steel tubular column with stiffening plates inside
The invention discloses a jacking pouring method for a concrete filled steel tubular column internally provided with stiffening plates. According to the technical scheme, firstly, mainly aiming at a steel pipe column segmented jacking and segmented jacking and grouting mode, the problem that during one-time jacking and grouting, the pressure is too large, pipe explosion is likely to happen is solved, the operation difficulty is reduced, and the construction efficiency is improved; meanwhile, compared with whole hoisting in the related technology, the method can achieve segmented hoisting, segment-by-segment welding and the like, the weight of a hoisting single hook is reduced, therefore, small hoisting machinery can be selected to complete hoisting work, the construction efficiency is improved, and the construction cost is reduced.
本申请公开了内有加劲板的钢管混凝土柱的顶升浇筑方法。本技术方案中,首先,主要针对钢管柱分段顶升,分段顶升压浆方式,解决一次性顶升压浆时压力过大容易爆管等问题,减小作业难度,提高施工效率。与此同时,与相关技术中整根吊装相比,本申请方法能够分段吊装、逐段焊接等,减小吊装单钩重量,从而可选用较小的吊装机械完成吊装工作,提高施工效率,降低施工成本。
Jacking pouring method for concrete filled steel tubular column with stiffening plates inside
The invention discloses a jacking pouring method for a concrete filled steel tubular column internally provided with stiffening plates. According to the technical scheme, firstly, mainly aiming at a steel pipe column segmented jacking and segmented jacking and grouting mode, the problem that during one-time jacking and grouting, the pressure is too large, pipe explosion is likely to happen is solved, the operation difficulty is reduced, and the construction efficiency is improved; meanwhile, compared with whole hoisting in the related technology, the method can achieve segmented hoisting, segment-by-segment welding and the like, the weight of a hoisting single hook is reduced, therefore, small hoisting machinery can be selected to complete hoisting work, the construction efficiency is improved, and the construction cost is reduced.
本申请公开了内有加劲板的钢管混凝土柱的顶升浇筑方法。本技术方案中,首先,主要针对钢管柱分段顶升,分段顶升压浆方式,解决一次性顶升压浆时压力过大容易爆管等问题,减小作业难度,提高施工效率。与此同时,与相关技术中整根吊装相比,本申请方法能够分段吊装、逐段焊接等,减小吊装单钩重量,从而可选用较小的吊装机械完成吊装工作,提高施工效率,降低施工成本。
Jacking pouring method for concrete filled steel tubular column with stiffening plates inside
内有加劲板的钢管混凝土柱的顶升浇筑方法
ZHAN JINHUA (Autor:in) / CAI CHEN (Autor:in) / TIAN GUOQING (Autor:in)
31.01.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Concrete filled steel tubular column pouring construction method
Europäisches Patentamt | 2024
|Hollow interlayer stiffening rib concrete-filled steel tubular column
Europäisches Patentamt | 2021
|Concrete filled steel tubular column pouring equipment and method
Europäisches Patentamt | 2024
|Concrete filled steel tubular column pumping and jacking construction method
Europäisches Patentamt | 2024
|