Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-speed rail platform olecranon-shaped hat stone paving construction method
According to the laying construction method for the eagle-beak-shaped cap stone of the high-speed rail platform, the defects that a traditional construction bonding layer without the eagle-beak-shaped cap stone is prone to loosening and poor in compactness and durability are overcome, the laying quality and attractiveness of the cap stone are improved, secondary treatment of the end of the bonding layer is reduced, and the engineering construction cost is effectively reduced. A reinforcing mesh is laid on the surface of a platform structure layer, and then an integral concrete cushion layer and an integral concrete reverse ridge are poured.
本发明提供了一种高铁站台鹰嘴型帽石铺贴施工方法,克服传统无鹰嘴型帽石施工结合层易松散、密实度、耐久性差的缺陷,提高帽石铺贴的质量和美观,减少结合层端部二次处理,有效降低了工程施工成本。主要通过在站台结构层的表面铺设钢筋网片,然后浇筑整体的混凝土垫层和混凝土反坎。
High-speed rail platform olecranon-shaped hat stone paving construction method
According to the laying construction method for the eagle-beak-shaped cap stone of the high-speed rail platform, the defects that a traditional construction bonding layer without the eagle-beak-shaped cap stone is prone to loosening and poor in compactness and durability are overcome, the laying quality and attractiveness of the cap stone are improved, secondary treatment of the end of the bonding layer is reduced, and the engineering construction cost is effectively reduced. A reinforcing mesh is laid on the surface of a platform structure layer, and then an integral concrete cushion layer and an integral concrete reverse ridge are poured.
本发明提供了一种高铁站台鹰嘴型帽石铺贴施工方法,克服传统无鹰嘴型帽石施工结合层易松散、密实度、耐久性差的缺陷,提高帽石铺贴的质量和美观,减少结合层端部二次处理,有效降低了工程施工成本。主要通过在站台结构层的表面铺设钢筋网片,然后浇筑整体的混凝土垫层和混凝土反坎。
High-speed rail platform olecranon-shaped hat stone paving construction method
一种高铁站台鹰嘴型帽石铺贴施工方法
LI PENG (Autor:in) / WANG CHUNGUANG (Autor:in) / LIU WEI (Autor:in) / LI WEI (Autor:in) / ZHANG LUJIE (Autor:in) / ZHANG WANXUN (Autor:in) / LIANG TIANLE (Autor:in) / WANG XIANGANG (Autor:in) / ZHOU CHENGHUI (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
High-speed rail platform antiskid ground paving structure and paving method thereof
Europäisches Patentamt | 2021
|STONE PAVING CONSTRUCTION METHOD, STONE PAVING PARTS MANUFACTURING METHOD, AND STONE PAVING PARTS
Europäisches Patentamt | 2018
|