Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
System for accelerating settlement of rock-fill dam
The invention relates to a system for accelerating settlement of a rock-fill dam, the system comprises a plurality of vibration devices and a power supply, the plurality of vibration devices are used for being pre-buried in the rock-fill dam, each vibration device comprises a shell and a vibration mechanism arranged in the shell, the vibration mechanism is used for driving the shell to vibrate, and the vibration frequencies of the plurality of vibration devices are the same; and the power supply is arranged outside a dam slope at the downstream of the rock-fill dam and is electrically connected to the vibration mechanisms of the vibration devices through cables. By means of the technical scheme, the settlement speed of the rock-fill dam in the construction period can be increased, the compactness of the rock-fill body is improved, and the quality and safety of the rock-fill dam are guaranteed.
本公开涉及一种加快堆石坝沉降的系统,包括多个振动装置和电源,多个振动装置用于预埋在堆石坝内部,振动装置包括壳体和设置在壳体内部的振动机构,振动机构用于带动壳体振动,多个振动装置的振动频率相同;电源用于设置在堆石坝下游的坝坡外部,电源通过电缆分别电连接于振动装置的振动机构。通过上述技术方案,本公开能够加快堆石坝施工期的沉降速度,提高堆石体的密实性,保障堆石坝的质量和安全性。
System for accelerating settlement of rock-fill dam
The invention relates to a system for accelerating settlement of a rock-fill dam, the system comprises a plurality of vibration devices and a power supply, the plurality of vibration devices are used for being pre-buried in the rock-fill dam, each vibration device comprises a shell and a vibration mechanism arranged in the shell, the vibration mechanism is used for driving the shell to vibrate, and the vibration frequencies of the plurality of vibration devices are the same; and the power supply is arranged outside a dam slope at the downstream of the rock-fill dam and is electrically connected to the vibration mechanisms of the vibration devices through cables. By means of the technical scheme, the settlement speed of the rock-fill dam in the construction period can be increased, the compactness of the rock-fill body is improved, and the quality and safety of the rock-fill dam are guaranteed.
本公开涉及一种加快堆石坝沉降的系统,包括多个振动装置和电源,多个振动装置用于预埋在堆石坝内部,振动装置包括壳体和设置在壳体内部的振动机构,振动机构用于带动壳体振动,多个振动装置的振动频率相同;电源用于设置在堆石坝下游的坝坡外部,电源通过电缆分别电连接于振动装置的振动机构。通过上述技术方案,本公开能够加快堆石坝施工期的沉降速度,提高堆石体的密实性,保障堆石坝的质量和安全性。
System for accelerating settlement of rock-fill dam
加快堆石坝沉降的系统
YAO FUHAI (Autor:in) / YANG ZEYAN (Autor:in) / LI JINGCHANG (Autor:in) / ZHOU WEI (Autor:in) / MA GANG (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Accelerating fill settlement with explosives
Engineering Index Backfile | 1930
|Settlement behaviour of a concrete faced rock-fill dam
British Library Online Contents | 2006
|Settlement behaviour of a concrete faced rock-fill dam
Online Contents | 2006
|British Library Conference Proceedings | 1994
|Application of gray theory in settlement forecast of rock-fill highway embankment
British Library Conference Proceedings | 2009
|