Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork-free steel plate concrete large pool wall and construction method
The invention discloses a formwork-erecting-free steel plate concrete large pool wall which comprises a pool raft plate, raft plate pre-embedded connecting keys are installed on the pool valve plate, the number of the raft plate pre-embedded connecting keys is two, and the pool valve plate is provided with a placing groove located between the two raft plate pre-embedded connecting keys; the invention further discloses a construction method of the formwork-free steel plate concrete large pool wall. The construction method comprises the following steps that S1, the raft plate pre-buried connecting keys are pre-buried in a large pool raft plate bottom plate. The modularized pool wall steel outer formwork serves as a concrete pool wall formwork, traditional complex procedures of erecting a scaffold, erecting a formwork and binding a steel bar and erecting the formwork are omitted, materials such as the scaffold, the formwork and the steel bar are saved, and meanwhile a large amount of construction period is saved; the modularized pool wall steel outer mold resists pool wall load tension, the concrete resists pool wall load pressure, and the pool wall structure is more reasonable in stress; and the steel outer molds are welded together, so that the problem of water leakage of a water tank due to cracking of traditional concrete is completely avoided.
本发明公开了一种免支模钢板混凝土大型水池池壁,包括水池筏板,所述水池阀板上安装有筏板预埋连接键,所述筏板预埋连接键的数量为两个,所述水池阀板上设有位于两个筏板预埋连接键之间的安放槽;本发明还公开了一种免支模钢板混凝土大型水池池壁的施工方法,包括以下步骤:S1,将筏板预埋连接键预先埋置于大型水池筏板底板内。本发明中模块化池壁钢外模充当混凝土池壁模板,免除传统搭设脚手架、支模板、绑钢筋支模板的复杂工序,节省脚手架、模板、钢筋等材料,同时节约大量工期;模块化池壁钢外模抵抗池壁荷载拉力,混凝土抵抗池壁荷载压力,池壁结构受力更加合理;钢外模焊接在一起,完全避免了传统混凝土开裂水池漏水的顽疾问题。
Formwork-free steel plate concrete large pool wall and construction method
The invention discloses a formwork-erecting-free steel plate concrete large pool wall which comprises a pool raft plate, raft plate pre-embedded connecting keys are installed on the pool valve plate, the number of the raft plate pre-embedded connecting keys is two, and the pool valve plate is provided with a placing groove located between the two raft plate pre-embedded connecting keys; the invention further discloses a construction method of the formwork-free steel plate concrete large pool wall. The construction method comprises the following steps that S1, the raft plate pre-buried connecting keys are pre-buried in a large pool raft plate bottom plate. The modularized pool wall steel outer formwork serves as a concrete pool wall formwork, traditional complex procedures of erecting a scaffold, erecting a formwork and binding a steel bar and erecting the formwork are omitted, materials such as the scaffold, the formwork and the steel bar are saved, and meanwhile a large amount of construction period is saved; the modularized pool wall steel outer mold resists pool wall load tension, the concrete resists pool wall load pressure, and the pool wall structure is more reasonable in stress; and the steel outer molds are welded together, so that the problem of water leakage of a water tank due to cracking of traditional concrete is completely avoided.
本发明公开了一种免支模钢板混凝土大型水池池壁,包括水池筏板,所述水池阀板上安装有筏板预埋连接键,所述筏板预埋连接键的数量为两个,所述水池阀板上设有位于两个筏板预埋连接键之间的安放槽;本发明还公开了一种免支模钢板混凝土大型水池池壁的施工方法,包括以下步骤:S1,将筏板预埋连接键预先埋置于大型水池筏板底板内。本发明中模块化池壁钢外模充当混凝土池壁模板,免除传统搭设脚手架、支模板、绑钢筋支模板的复杂工序,节省脚手架、模板、钢筋等材料,同时节约大量工期;模块化池壁钢外模抵抗池壁荷载拉力,混凝土抵抗池壁荷载压力,池壁结构受力更加合理;钢外模焊接在一起,完全避免了传统混凝土开裂水池漏水的顽疾问题。
Formwork-free steel plate concrete large pool wall and construction method
一种免支模钢板混凝土大型水池池壁及施工方法
HUANG YUNCHANG (Autor:in) / WANG XIUJUN (Autor:in) / XIAO HAN (Autor:in) / LIU CHENGLIN (Autor:in) / ZHU MIN (Autor:in) / ZHU BIN (Autor:in) / LI RENZHUANG (Autor:in) / ZHAO WENBO (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Punching-free construction method for concrete wall wood formwork
Europäisches Patentamt | 2024
|Integrated formwork system suitable for pool wall concrete pouring and construction method thereof
Europäisches Patentamt | 2020
|