Construction method of vibro-replacement stone column machine
The invention discloses a vibro-replacement gravel pile machine construction method which comprises the following steps: automatically guiding a vibro-replacement gravel pile machine to a to-be-constructed pile point according to latitude and longitude information of the to-be-constructed pile point and the vibro-replacement gravel pile machine, and aligning a vibro-replacement device system to the to-be-constructed pile point; after the vibroflot system is aligned with the construction pile point, the perpendicularity of the vibroflot system is adjusted, so that the vibroflot system vertically conducts vibroflot hole-forming construction on the construction pile point; in the process of performing pore-forming construction on a construction pile point, the flow of water and the pressure of air of an automatic feeding system acting on pore-forming construction in cooperation with the vibroflot system are adjusted according to the current stratum compactness, the perpendicularity of the vibroflot system is detected in real time, and the perpendicularity of the vibroflot system is adjusted according to the detected perpendicularity deviation; after pile holes are formed through hole-forming construction, materials are automatically fed into the pile holes meeting the perpendicularity requirement through a loading machine, and vibro-replacement gravel piles meeting the perpendicularity requirement and the preset pile diameter requirement are formed through construction of a vibro-replacement device system. According to the method, the pile machine is automatically in place, the method is suitable for the situation that the visual field is poor, water vapor is accurately controlled under different stratums, automatic feeding is achieved, the stone weight is dynamically measured in real time, and the vibro-replacement gravel pile with the uniform and continuous pile diameter and the perpendicularity meeting the requirement can be formed.
本发明公开一种振冲碎石桩机施工的方法,包括:根据待施工桩点和振冲碎石桩机的经纬度信息,将振冲碎石桩机自动引导到待施工桩点处,并使振冲器系统对准施工桩点;在振冲器系统对准施工桩点后,调节振冲器系统的垂直度,使振冲器系统垂直地对施工桩点进行振冲造孔施工;对施工桩点进行造孔施工的过程中,根据当前地层密实度调节协同振冲器系统作用造孔施工的自动进给系统的下水的流量和下气的压力,并实时检测振冲器系统的垂直度,以根据检测到的垂直度偏差对振冲器系统垂直度进行调节;造孔施工形成桩孔后,通过装载机向符合垂直度要求的桩孔内自动上料,并通过振冲器系统施工形成符合垂直度要求和预设桩径要求的振冲碎石桩。本发明方法,桩机自动就位,适用视野不佳情况,不同地层下精确控制水气,自动上料并动态实时计量石料重量,可形成垂直度符合要求的桩径均匀且连续的振冲碎石桩。
Construction method of vibro-replacement stone column machine
The invention discloses a vibro-replacement gravel pile machine construction method which comprises the following steps: automatically guiding a vibro-replacement gravel pile machine to a to-be-constructed pile point according to latitude and longitude information of the to-be-constructed pile point and the vibro-replacement gravel pile machine, and aligning a vibro-replacement device system to the to-be-constructed pile point; after the vibroflot system is aligned with the construction pile point, the perpendicularity of the vibroflot system is adjusted, so that the vibroflot system vertically conducts vibroflot hole-forming construction on the construction pile point; in the process of performing pore-forming construction on a construction pile point, the flow of water and the pressure of air of an automatic feeding system acting on pore-forming construction in cooperation with the vibroflot system are adjusted according to the current stratum compactness, the perpendicularity of the vibroflot system is detected in real time, and the perpendicularity of the vibroflot system is adjusted according to the detected perpendicularity deviation; after pile holes are formed through hole-forming construction, materials are automatically fed into the pile holes meeting the perpendicularity requirement through a loading machine, and vibro-replacement gravel piles meeting the perpendicularity requirement and the preset pile diameter requirement are formed through construction of a vibro-replacement device system. According to the method, the pile machine is automatically in place, the method is suitable for the situation that the visual field is poor, water vapor is accurately controlled under different stratums, automatic feeding is achieved, the stone weight is dynamically measured in real time, and the vibro-replacement gravel pile with the uniform and continuous pile diameter and the perpendicularity meeting the requirement can be formed.
本发明公开一种振冲碎石桩机施工的方法,包括:根据待施工桩点和振冲碎石桩机的经纬度信息,将振冲碎石桩机自动引导到待施工桩点处,并使振冲器系统对准施工桩点;在振冲器系统对准施工桩点后,调节振冲器系统的垂直度,使振冲器系统垂直地对施工桩点进行振冲造孔施工;对施工桩点进行造孔施工的过程中,根据当前地层密实度调节协同振冲器系统作用造孔施工的自动进给系统的下水的流量和下气的压力,并实时检测振冲器系统的垂直度,以根据检测到的垂直度偏差对振冲器系统垂直度进行调节;造孔施工形成桩孔后,通过装载机向符合垂直度要求的桩孔内自动上料,并通过振冲器系统施工形成符合垂直度要求和预设桩径要求的振冲碎石桩。本发明方法,桩机自动就位,适用视野不佳情况,不同地层下精确控制水气,自动上料并动态实时计量石料重量,可形成垂直度符合要求的桩径均匀且连续的振冲碎石桩。
Construction method of vibro-replacement stone column machine
振冲碎石桩机施工的方法
SUN LIANG (Autor:in) / ZHAO JUN (Autor:in) / TANG YONGJUN (Autor:in) / HAN WEI (Autor:in) / SHI FENG (Autor:in) / CAO JIE (Autor:in) / SEAN SHANG (Autor:in) / XU FANGCAI (Autor:in) / ZHANG JIAJUN (Autor:in) / DING HAILONG (Autor:in)
17.02.2023
Patent
Elektronische Ressource
Chinesisch
Vibro-replacement hole-forming construction method of vibro-replacement stone column machine
Europäisches Patentamt | 2023
|Automatic feeding method in vibro-replacement stone column machine construction
Europäisches Patentamt | 2023
|Vibro-replacement stone column and construction method thereof
Europäisches Patentamt | 2020
|Method for controlling construction depth of vibro-replacement stone column machine
Europäisches Patentamt | 2023
|Method for controlling construction perpendicularity of vibro-replacement stone column machine
Europäisches Patentamt | 2023
|