Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device for water conservancy project
The invention relates to the field of water conservancy construction, in particular to a construction device for a water conservancy project. The technical problems that in the current stage of ditch lining construction, broken soil blocks can fall off on the two sides of a foundation trench of a ditch, the broken soil blocks are accumulated in the foundation trench, the foundation trench defects are caused, concrete of a lining layer after lining is uneven, and the strength is reduced are solved. According to the technical scheme, the construction device for the water conservancy project comprises a cleaning system, a joint cutting system and the like; the lining machine is connected with a cleaning system; the lining machine is connected with a joint cutting system, and the joint cutting system is located on the right side of the cleaning system. The guide plates are sequentially lengthened from top to bottom, so that crushed soil blocks flow into gaps between the first pressing plates and the side walls of the foundation trench, the crushed soil blocks are filled and compacted to the two sides of the foundation trench through the first pressing plates moving leftwards, the defects of the foundation trench are overcome, and the defects of the foundation trench caused by the fact that the soil blocks on the two sides and the edges of the foundation trench fall into the foundation trench are avoided; and the structural strength of the lining layer is reduced.
本发明涉及水利施工领域,尤其涉及一种水利工程用施工装置。技术问题:现阶段在沟渠衬砌施工中,沟渠的基槽两边会有碎土块掉落,导致碎土块在基槽内堆积以及造成基槽缺陷,致使衬砌后衬砌层的混凝土不均匀,强度降低。本发明的技术方案为:一种水利工程用施工装置,包括有清理系统和切缝系统等;衬砌机连接有清理系统;衬砌机连接有切缝系统,且切缝系统位于清理系统右方。通过导流板的自上而下依次加长设置,使碎土块流入到第一压板和基槽侧壁的缝隙处,通过向左移动的第一压板将其填充并压实到基槽的两侧,以弥补基槽的缺陷,避免了因基槽两侧及边缘的土块掉落到基槽内导致基槽的缺陷,导致衬砌层结构强度降低的问题。
Construction device for water conservancy project
The invention relates to the field of water conservancy construction, in particular to a construction device for a water conservancy project. The technical problems that in the current stage of ditch lining construction, broken soil blocks can fall off on the two sides of a foundation trench of a ditch, the broken soil blocks are accumulated in the foundation trench, the foundation trench defects are caused, concrete of a lining layer after lining is uneven, and the strength is reduced are solved. According to the technical scheme, the construction device for the water conservancy project comprises a cleaning system, a joint cutting system and the like; the lining machine is connected with a cleaning system; the lining machine is connected with a joint cutting system, and the joint cutting system is located on the right side of the cleaning system. The guide plates are sequentially lengthened from top to bottom, so that crushed soil blocks flow into gaps between the first pressing plates and the side walls of the foundation trench, the crushed soil blocks are filled and compacted to the two sides of the foundation trench through the first pressing plates moving leftwards, the defects of the foundation trench are overcome, and the defects of the foundation trench caused by the fact that the soil blocks on the two sides and the edges of the foundation trench fall into the foundation trench are avoided; and the structural strength of the lining layer is reduced.
本发明涉及水利施工领域,尤其涉及一种水利工程用施工装置。技术问题:现阶段在沟渠衬砌施工中,沟渠的基槽两边会有碎土块掉落,导致碎土块在基槽内堆积以及造成基槽缺陷,致使衬砌后衬砌层的混凝土不均匀,强度降低。本发明的技术方案为:一种水利工程用施工装置,包括有清理系统和切缝系统等;衬砌机连接有清理系统;衬砌机连接有切缝系统,且切缝系统位于清理系统右方。通过导流板的自上而下依次加长设置,使碎土块流入到第一压板和基槽侧壁的缝隙处,通过向左移动的第一压板将其填充并压实到基槽的两侧,以弥补基槽的缺陷,避免了因基槽两侧及边缘的土块掉落到基槽内导致基槽的缺陷,导致衬砌层结构强度降低的问题。
Construction device for water conservancy project
一种水利工程用施工装置
QI HUIZHONG (Autor:in) / WANG SHU (Autor:in)
28.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Water conservancy project construction waterproof drainage device
Europäisches Patentamt | 2021
|Adjustable water conservancy project construction drainage device
Europäisches Patentamt | 2020
|Grouting construction device for water conservancy project
Europäisches Patentamt | 2024
|Water conservancy project construction wave blocking device
Europäisches Patentamt | 2024
|