Building material protective shed for construction site
The invention relates to a building material protective shed, in particular to a building material protective shed for a construction site. The invention aims to provide the building material protective shed for the construction site, which is convenient to operate and can protect building materials with different sizes. According to the technical scheme, the building material protective shed for the construction site comprises foot stools, supporting rods, first connecting rods, connecting sleeves and the like, the number of the connecting sleeves is two, the connecting sleeves are arranged in a bilateral symmetry mode, the connecting sleeves are used for placing awning cloth, and the first connecting rods are arranged in the connecting sleeves in a front-back symmetry sliding mode. The first connecting rods are pulled to slide outwards in the connecting sleeves according to needs, then the foot stools on the left side and the right side are pulled to be far away from each other, and therefore building materials of different sizes can be covered, and then the building materials can be protected by winding the awning cloth on the connecting sleeves.
本发明涉及建筑材料防护棚,尤其涉及一种建筑工地的建筑材料防护棚。本发明的目的是提供一种操作便利,可对不同大小的建筑材料均进行保护的建筑工地的建筑材料防护棚。本发明通过以下技术途径实现:一种建筑工地的建筑材料防护棚,包括有脚架、支撑杆、第一连接杆、连接套等,连接套有两根,连接套为左右对称设置,连接套用于对雨篷布进行放置,连接套内均前后对称滑动式设有第一连接杆。根据需要拉动第一连接杆在连接套内向外侧滑动,随后再拉动左右两侧的脚架相互远离,如此便可对不同大小的建筑材料均进行覆盖,随后在连接套绕卷雨篷布便可对建筑材料进行保护。
Building material protective shed for construction site
The invention relates to a building material protective shed, in particular to a building material protective shed for a construction site. The invention aims to provide the building material protective shed for the construction site, which is convenient to operate and can protect building materials with different sizes. According to the technical scheme, the building material protective shed for the construction site comprises foot stools, supporting rods, first connecting rods, connecting sleeves and the like, the number of the connecting sleeves is two, the connecting sleeves are arranged in a bilateral symmetry mode, the connecting sleeves are used for placing awning cloth, and the first connecting rods are arranged in the connecting sleeves in a front-back symmetry sliding mode. The first connecting rods are pulled to slide outwards in the connecting sleeves according to needs, then the foot stools on the left side and the right side are pulled to be far away from each other, and therefore building materials of different sizes can be covered, and then the building materials can be protected by winding the awning cloth on the connecting sleeves.
本发明涉及建筑材料防护棚,尤其涉及一种建筑工地的建筑材料防护棚。本发明的目的是提供一种操作便利,可对不同大小的建筑材料均进行保护的建筑工地的建筑材料防护棚。本发明通过以下技术途径实现:一种建筑工地的建筑材料防护棚,包括有脚架、支撑杆、第一连接杆、连接套等,连接套有两根,连接套为左右对称设置,连接套用于对雨篷布进行放置,连接套内均前后对称滑动式设有第一连接杆。根据需要拉动第一连接杆在连接套内向外侧滑动,随后再拉动左右两侧的脚架相互远离,如此便可对不同大小的建筑材料均进行覆盖,随后在连接套绕卷雨篷布便可对建筑材料进行保护。
Building material protective shed for construction site
一种建筑工地的建筑材料防护棚
HUANG GONGLAN (Autor:in)
28.02.2023
Patent
Elektronische Ressource
Chinesisch
Building material protective shed in construction site
Europäisches Patentamt | 2021
|Intelligent protective shed for construction site and steel structure of intelligent protective shed
Europäisches Patentamt | 2021
|