Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Spring opening treatment process
The embodiment of the invention provides a spring opening treatment process, and relates to the technical field of road construction. The spring opening treatment process comprises the steps that a cutoff wall is arranged on a road groove section corresponding to a spring opening to prevent water from permeating and diffusing all around, and the water in the cutoff wall is drained out of a roadbed where the road groove section is located through a drainage groove; backfilling operation is conducted on the area in the cutoff wall to form an inverted filter layer, it is guaranteed that seepage water is drained smoothly, and therefore the purposes of water drainage and pressure relief are achieved; the waterproof layer and the concrete layer are sequentially arranged on the inverted filter layer, the waterproof layer is used for separating spring opening water from the concrete layer and preventing the concrete layer from being damaged by spring opening water seepage and affecting the concrete strength, the concrete layer plays a role in sealing and pressing the spring opening and improving the strength, and finally the purpose of water plugging is achieved.
本发明的实施例提供了一种泉眼处治工艺,涉及道路施工技术领域。泉眼处治工艺包括:通过在泉眼对应的路槽段设置截水墙,以防止水向四周渗透扩散,并通过引流槽将截水墙内的水引流出路槽段所在的路基外;通过对截水墙内的区域进行回填作业以形成反滤层,保证渗水通畅排出,从而达到排水泄压的目的;在反滤层上依次设置防水层以及混凝土层,防水层用于隔断泉眼水与混凝土层,防止泉眼渗水破坏混凝土层而影响混凝土强度,而混凝土层则起到封压泉眼、提高强度的作用,最终达到堵水的目的。
Spring opening treatment process
The embodiment of the invention provides a spring opening treatment process, and relates to the technical field of road construction. The spring opening treatment process comprises the steps that a cutoff wall is arranged on a road groove section corresponding to a spring opening to prevent water from permeating and diffusing all around, and the water in the cutoff wall is drained out of a roadbed where the road groove section is located through a drainage groove; backfilling operation is conducted on the area in the cutoff wall to form an inverted filter layer, it is guaranteed that seepage water is drained smoothly, and therefore the purposes of water drainage and pressure relief are achieved; the waterproof layer and the concrete layer are sequentially arranged on the inverted filter layer, the waterproof layer is used for separating spring opening water from the concrete layer and preventing the concrete layer from being damaged by spring opening water seepage and affecting the concrete strength, the concrete layer plays a role in sealing and pressing the spring opening and improving the strength, and finally the purpose of water plugging is achieved.
本发明的实施例提供了一种泉眼处治工艺,涉及道路施工技术领域。泉眼处治工艺包括:通过在泉眼对应的路槽段设置截水墙,以防止水向四周渗透扩散,并通过引流槽将截水墙内的水引流出路槽段所在的路基外;通过对截水墙内的区域进行回填作业以形成反滤层,保证渗水通畅排出,从而达到排水泄压的目的;在反滤层上依次设置防水层以及混凝土层,防水层用于隔断泉眼水与混凝土层,防止泉眼渗水破坏混凝土层而影响混凝土强度,而混凝土层则起到封压泉眼、提高强度的作用,最终达到堵水的目的。
Spring opening treatment process
一种泉眼处治工艺
WANG FENG (Autor:in) / DONG ZHANXIONG (Autor:in) / MA WANFEI (Autor:in) / YUAN KONGJUN (Autor:in) / FENG HAOBIN (Autor:in) / YIN SHUAIJIE (Autor:in) / ZHOU SU'EN (Autor:in) / YUAN JINHUA (Autor:in) / ZHANG HONGYU (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE