Cutting drainage ditch slip form construction method
The invention discloses a cutting drainage ditch slip-form construction method, which is used for a slip-form machine, the slip-form machine comprises a vibrating bin, a feeding port, a discharging port, and a control device, the vibrating bin is internally provided with a vibrating space communicated with the feeding port; the bottom end of the forming bin is sunken inwards to form a cutting forming space, and the cutting forming space communicates with the vibrating space; the vibrating assembly is arranged in the vibrating bin; the method comprises the following steps: forming a walking lead; according to the walking wire, the slip form machine is made to conduct cutting drainage ditch slip form construction along the walking wire, and a cutting drainage ditch is formed; and forming a deformation joint and a construction joint in the cutting drainage ditch. Concrete is fully vibrated through the vibrating assembly, then extruded and formed through the cutting forming space and extruded to the road surface through the forming bin to form the cutting drainage ditch, the forming quality of the cutting drainage ditch is improved, and meanwhile the construction efficiency of the cutting drainage ditch is improved.
本发明公开了一种路堑排水沟滑模施工方法,用于滑模机,所述滑模机包括:振捣仓,所述振捣仓内形成有与所述进料口连通的振捣空间;成型仓,所述成型仓的底端向内凹陷形成有路堑成型空间,所述路堑成型空间与所述振捣空间连通;振捣组件,所述振捣仓内设置有所述振捣组件;所述方法包括:在形成行走导线;根据所述行走导线,使所述滑模机沿所述行走导线进行路堑排水沟滑模施工,形成所述路堑排水沟;在所述路堑排水沟形成变形缝和施工缝。本发明通过振捣组件对混凝土进行充分振捣,再经由路堑成型空间挤压成型,并通过成型仓挤出于路面,以形成路堑排水沟,提高了路堑排水沟的成型质量的同时,提高了路堑排水沟的施工效率。
Cutting drainage ditch slip form construction method
The invention discloses a cutting drainage ditch slip-form construction method, which is used for a slip-form machine, the slip-form machine comprises a vibrating bin, a feeding port, a discharging port, and a control device, the vibrating bin is internally provided with a vibrating space communicated with the feeding port; the bottom end of the forming bin is sunken inwards to form a cutting forming space, and the cutting forming space communicates with the vibrating space; the vibrating assembly is arranged in the vibrating bin; the method comprises the following steps: forming a walking lead; according to the walking wire, the slip form machine is made to conduct cutting drainage ditch slip form construction along the walking wire, and a cutting drainage ditch is formed; and forming a deformation joint and a construction joint in the cutting drainage ditch. Concrete is fully vibrated through the vibrating assembly, then extruded and formed through the cutting forming space and extruded to the road surface through the forming bin to form the cutting drainage ditch, the forming quality of the cutting drainage ditch is improved, and meanwhile the construction efficiency of the cutting drainage ditch is improved.
本发明公开了一种路堑排水沟滑模施工方法,用于滑模机,所述滑模机包括:振捣仓,所述振捣仓内形成有与所述进料口连通的振捣空间;成型仓,所述成型仓的底端向内凹陷形成有路堑成型空间,所述路堑成型空间与所述振捣空间连通;振捣组件,所述振捣仓内设置有所述振捣组件;所述方法包括:在形成行走导线;根据所述行走导线,使所述滑模机沿所述行走导线进行路堑排水沟滑模施工,形成所述路堑排水沟;在所述路堑排水沟形成变形缝和施工缝。本发明通过振捣组件对混凝土进行充分振捣,再经由路堑成型空间挤压成型,并通过成型仓挤出于路面,以形成路堑排水沟,提高了路堑排水沟的成型质量的同时,提高了路堑排水沟的施工效率。
Cutting drainage ditch slip form construction method
路堑排水沟滑模施工方法
ZHANG YI (Autor:in) / ZHAO SHUNGUO (Autor:in) / ZHANG HUAJIAN (Autor:in) / MENG XIAOKANG (Autor:in) / DONG WEIWEI (Autor:in) / WANG LONG (Autor:in) / WANG PENG (Autor:in) / PANG DONGSHENG (Autor:in) / WEI HUI (Autor:in) / LI XIAN (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
One-time slip form construction method for cutting ultrahigh drainage ditch
Europäisches Patentamt | 2023
|Slip form mold for construction of cutting ultrahigh drainage ditch
Europäisches Patentamt | 2023
|Slip form concrete for construction of cutting ultrahigh ditch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|