Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Piling device used in building engineering construction process
The invention discloses a piling device used in the building engineering construction process, and relates to the technical field of buildings. Comprising a piling rod, a buffering mechanism is arranged at the bottom of the piling rod, the buffering mechanism comprises an extension plate, a sliding rod, a pressure bearing plate, a rotating plate and a sliding plate, the extension plate is fixedly embedded in the outer wall of the bottom of the piling rod, the sliding rod penetrates through and is slidably installed at the bottom of the piling rod, and the outer wall of the sliding rod is elastically connected with the inner wall of the bottom of the piling rod through an elastic piece; the top of the bearing plate is fixedly embedded in the bottom of the sliding rod, and the top of the rotating plate is movably connected with the bottom of the bearing plate. According to the piling device used in the building engineering construction process, the buffering mechanism and the pushing mechanism are arranged at the bottom of the piling rod, damage to the bottom of the piling rod caused by sharp stones can be effectively relieved, meanwhile, the outer wall of the piling rod is cleaned and hammered through power brought by buffering, and then the piling effect of the piling rod is promoted; the working efficiency is improved.
本发明公开了一种用于建筑工程施工过程中的打桩装置,涉及建筑技术领域。包括打桩棒,所述打桩棒底部设置有缓冲机构,所述缓冲机构包括延长板、滑杆、承压板、转动板和滑板,所述延长板嵌固于打桩棒底部外壁上,所述滑杆贯穿且滑动安装于打桩棒底部,所述滑杆外壁与打桩棒底部内壁之间通过弹片弹性连接,所述承压板顶部嵌固于滑杆底部,所述转动板顶部与承压板底部活动连接。该用于建筑工程施工过程中的打桩装置,通过在打桩棒底部设置有缓冲机构和推动机构,可以有效的减轻尖锐石块对打桩棒底部造成的损伤,同时通过缓冲带来的动力对打桩棒外壁进行清洁操作和捶打操作,进而促进打桩棒的打桩效果,提高工作效率。
Piling device used in building engineering construction process
The invention discloses a piling device used in the building engineering construction process, and relates to the technical field of buildings. Comprising a piling rod, a buffering mechanism is arranged at the bottom of the piling rod, the buffering mechanism comprises an extension plate, a sliding rod, a pressure bearing plate, a rotating plate and a sliding plate, the extension plate is fixedly embedded in the outer wall of the bottom of the piling rod, the sliding rod penetrates through and is slidably installed at the bottom of the piling rod, and the outer wall of the sliding rod is elastically connected with the inner wall of the bottom of the piling rod through an elastic piece; the top of the bearing plate is fixedly embedded in the bottom of the sliding rod, and the top of the rotating plate is movably connected with the bottom of the bearing plate. According to the piling device used in the building engineering construction process, the buffering mechanism and the pushing mechanism are arranged at the bottom of the piling rod, damage to the bottom of the piling rod caused by sharp stones can be effectively relieved, meanwhile, the outer wall of the piling rod is cleaned and hammered through power brought by buffering, and then the piling effect of the piling rod is promoted; the working efficiency is improved.
本发明公开了一种用于建筑工程施工过程中的打桩装置,涉及建筑技术领域。包括打桩棒,所述打桩棒底部设置有缓冲机构,所述缓冲机构包括延长板、滑杆、承压板、转动板和滑板,所述延长板嵌固于打桩棒底部外壁上,所述滑杆贯穿且滑动安装于打桩棒底部,所述滑杆外壁与打桩棒底部内壁之间通过弹片弹性连接,所述承压板顶部嵌固于滑杆底部,所述转动板顶部与承压板底部活动连接。该用于建筑工程施工过程中的打桩装置,通过在打桩棒底部设置有缓冲机构和推动机构,可以有效的减轻尖锐石块对打桩棒底部造成的损伤,同时通过缓冲带来的动力对打桩棒外壁进行清洁操作和捶打操作,进而促进打桩棒的打桩效果,提高工作效率。
Piling device used in building engineering construction process
一种用于建筑工程施工过程中的打桩装置
ZHANG WENJIE (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Piling device used in construction process of constructional engineering
Europäisches Patentamt | 2020
|Rapid piling device for building engineering construction
Europäisches Patentamt | 2023
|Rapid piling equipment for building engineering construction
Europäisches Patentamt | 2022
|Rapid piling equipment for building engineering construction
Europäisches Patentamt | 2021
|