Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated equipment supporting beam and construction method thereof
The invention relates to an electrical equipment base, and discloses a prefabricated equipment supporting beam and a construction method thereof.The prefabricated equipment supporting beam comprises a prefabricated foundation and a prefabricated beam and further comprises bolts fixed to the edge of the upper end face of the prefabricated foundation and grouting holes formed in the lower end face of the end of the prefabricated beam; the bolt is vertically arranged upwards and is in threaded connection with an adjusting nut, a grout outlet hole and a grout inlet hole which are communicated with the grouting hole are formed in the end face of the prefabricated beam, and when the prefabricated beam is installed on the prefabricated foundation, the bolt is inserted into the grouting hole, and the adjusting nut is located between the lower end face of the prefabricated beam and the upper end face of the prefabricated foundation. On the premise that it is guaranteed that the supporting beam of the prefabricated equipment has enough strength during construction, precise and rapid positioning and rapid assembly of installation of the prefabricated beam on a prefabricated foundation can be achieved, the overall construction period can be effectively shortened, meanwhile, the horizontal height of the end of the prefabricated beam can be adjusted, and it is guaranteed that upper equipment is stably located on the prefabricated beam.
本发明涉及一种电气设备底座,公开了一种预制设备支撑梁及其施工方法,其包括预制基础和预制梁,还包括固定在预制基础上端面边缘处的螺栓和设置于预制梁的端部下端面上的灌浆孔,螺栓竖直向上设置且螺栓上螺纹连接有调节螺母,预制梁的端面上设有与灌浆孔连通的出浆孔和进浆孔,预制梁安装在预制基础上时螺栓插入灌浆孔内且调节螺母处于预制梁下端面与预制基础上端面之间。本发明在保证预制设备支撑梁施工时具有足够的强度的前提下,还能够实现预制梁在预制基础上安装的精准快速定位、快速组装,能够有效缩短整体工期,同时能够调节预制梁端部水平高度,保证上部设备平稳就位在预制梁上。
Prefabricated equipment supporting beam and construction method thereof
The invention relates to an electrical equipment base, and discloses a prefabricated equipment supporting beam and a construction method thereof.The prefabricated equipment supporting beam comprises a prefabricated foundation and a prefabricated beam and further comprises bolts fixed to the edge of the upper end face of the prefabricated foundation and grouting holes formed in the lower end face of the end of the prefabricated beam; the bolt is vertically arranged upwards and is in threaded connection with an adjusting nut, a grout outlet hole and a grout inlet hole which are communicated with the grouting hole are formed in the end face of the prefabricated beam, and when the prefabricated beam is installed on the prefabricated foundation, the bolt is inserted into the grouting hole, and the adjusting nut is located between the lower end face of the prefabricated beam and the upper end face of the prefabricated foundation. On the premise that it is guaranteed that the supporting beam of the prefabricated equipment has enough strength during construction, precise and rapid positioning and rapid assembly of installation of the prefabricated beam on a prefabricated foundation can be achieved, the overall construction period can be effectively shortened, meanwhile, the horizontal height of the end of the prefabricated beam can be adjusted, and it is guaranteed that upper equipment is stably located on the prefabricated beam.
本发明涉及一种电气设备底座,公开了一种预制设备支撑梁及其施工方法,其包括预制基础和预制梁,还包括固定在预制基础上端面边缘处的螺栓和设置于预制梁的端部下端面上的灌浆孔,螺栓竖直向上设置且螺栓上螺纹连接有调节螺母,预制梁的端面上设有与灌浆孔连通的出浆孔和进浆孔,预制梁安装在预制基础上时螺栓插入灌浆孔内且调节螺母处于预制梁下端面与预制基础上端面之间。本发明在保证预制设备支撑梁施工时具有足够的强度的前提下,还能够实现预制梁在预制基础上安装的精准快速定位、快速组装,能够有效缩短整体工期,同时能够调节预制梁端部水平高度,保证上部设备平稳就位在预制梁上。
Prefabricated equipment supporting beam and construction method thereof
一种预制设备支撑梁及其施工方法
ZHU TIANXIANG (Autor:in) / FAN XIAOQING (Autor:in) / WANG WENBIN (Autor:in) / LIU GANG (Autor:in) / CHEN YONGGUI (Autor:in) / LI DONG (Autor:in) / LIU BIQING (Autor:in) / GE CHAO (Autor:in) / TANG JIAMING (Autor:in) / ZHANG SHENGLI (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
Prefabricated combined supporting structure and construction method thereof
Europäisches Patentamt | 2024
|Prefabricated straining beam, supporting structure and prefabricated straining beam mounting method
Europäisches Patentamt | 2022
|Slidable assembly device for prefabricated supporting beam and construction method
Europäisches Patentamt | 2021
|Prefabricated part inclined supporting structure and construction method thereof
Europäisches Patentamt | 2021
|Prefabricated slab and prefabricated beam connection node and construction method thereof
Europäisches Patentamt | 2016
|