Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Terrazzo filling method for cover plate of stainless steel invisible well lid
The invention discloses a terrazzo filling method for a cover plate of a stainless steel invisible well lid. The method comprises the following steps that S1, a well ring is lifted, a shaft is additionally arranged below the well ring, and bolts are used for anchoring; s2, a well lid is installed, integral concrete is poured, and pouring and bottoming are conducted through cement mortar; s3, leveling and plastering are carried out; s4, polishing; s5, polishing is conducted after the sand holes are repaired, the number of maintenance days is determined for polishing after the sand holes are repaired, and the polishing steps include trial polishing, rough polishing, fine polishing and smooth polishing; s6, oxalic acid is used for scrubbing; s7, protecting a finished product; s8, checking and accepting products meeting the standard; the method has the beneficial effects that the overall pavement effect of the well lid can be improved, the service life of the well lid can be prolonged, and the durability of the well lid can be improved.
本发明公开了一种不锈钢隐形井盖盖板水磨石填充方法,该方法包括以下步骤:S1:提升井圈,在井圈下加设井筒以及使用螺栓锚固;S2:安装井盖以及浇注整体式混凝土,通过水泥砂浆进行浇注打底;S3:进行找平抹面;S4:磨光;S5:修补砂眼后进行打磨,修补砂眼后确定养护天数进行打磨,打磨步骤包括试磨、粗磨、细磨以及光磨;S6:使用草酸进行擦洗;S7:对成品进行保护;S8:对符合标准的产品进行验收;本发明的有益效果是:该方法可以提高井盖的铺装整体效果,还可以提高井盖的使用寿命以及耐久性。
Terrazzo filling method for cover plate of stainless steel invisible well lid
The invention discloses a terrazzo filling method for a cover plate of a stainless steel invisible well lid. The method comprises the following steps that S1, a well ring is lifted, a shaft is additionally arranged below the well ring, and bolts are used for anchoring; s2, a well lid is installed, integral concrete is poured, and pouring and bottoming are conducted through cement mortar; s3, leveling and plastering are carried out; s4, polishing; s5, polishing is conducted after the sand holes are repaired, the number of maintenance days is determined for polishing after the sand holes are repaired, and the polishing steps include trial polishing, rough polishing, fine polishing and smooth polishing; s6, oxalic acid is used for scrubbing; s7, protecting a finished product; s8, checking and accepting products meeting the standard; the method has the beneficial effects that the overall pavement effect of the well lid can be improved, the service life of the well lid can be prolonged, and the durability of the well lid can be improved.
本发明公开了一种不锈钢隐形井盖盖板水磨石填充方法,该方法包括以下步骤:S1:提升井圈,在井圈下加设井筒以及使用螺栓锚固;S2:安装井盖以及浇注整体式混凝土,通过水泥砂浆进行浇注打底;S3:进行找平抹面;S4:磨光;S5:修补砂眼后进行打磨,修补砂眼后确定养护天数进行打磨,打磨步骤包括试磨、粗磨、细磨以及光磨;S6:使用草酸进行擦洗;S7:对成品进行保护;S8:对符合标准的产品进行验收;本发明的有益效果是:该方法可以提高井盖的铺装整体效果,还可以提高井盖的使用寿命以及耐久性。
Terrazzo filling method for cover plate of stainless steel invisible well lid
一种不锈钢隐形井盖盖板水磨石填充方法
BAI ZHUO (Autor:in) / HUANG GEN (Autor:in) / LI HUIYI (Autor:in) / LUO QINGLIN (Autor:in) / LI ZHIHONG (Autor:in) / HAN YAN (Autor:in) / ZOU LEI (Autor:in) / ZHAO XIUMING (Autor:in) / ZHAO YONGKANG (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
Terrazzo. the timeless allure of terrazzo
British Library Online Contents | 2001
British Library Online Contents | 2011
|