Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of waffle plate layer structure
The invention provides a construction method of a waffle plate layer structure, and belongs to the technical field of building construction, the waffle plate layer construction slurry leakage prevention structure comprises a waffle cylinder, and the waffle cylinder comprises five parts including a cylinder body, a cover plate, a top ring, a base and a bottom ring; the construction method comprises the steps that a waffle plate floor formwork is laid; positioning and paying off the waffle cylinder; a base of the waffle cylinder is installed and fixed through self-tapping screws; binding reinforcing steel bars; a bottom ring, a cylinder body and a top ring of the waffle cylinder are sequentially installed, and the installed waffle cylinder is fixed; a cover plate for fixing the waffle cylinder is installed on the cylinder body of the waffle cylinder which is installed and fixed; a correction pull rod of the waffle cylinder is installed, and the pull rod and the steel bars are welded and fixed; concrete is poured, the top ring, the bottom ring and the concrete are poured into a whole, and after pouring, the surface of the waffle cylinder is subjected to light receiving treatment; the waffle cylinder is coated, the waffle cylinder is dismantled, and specifically, the cover plate, the cylinder body and the bottom die are dismantled in sequence; the problems that a waffle layer structure is difficult to construct and a coating material is poor in weather resistance can be solved.
本发明提供了一种华夫板层结构的施工方法,属于建筑施工技术领域,该华夫板层施工防漏浆结构及其施工方法包括华夫筒,所述华夫筒包括筒身、盖板、顶环、底座、底环五个部分构成;所述施工方法包括铺设华夫板楼面模板;华夫筒定位放线;安装华夫筒的底座并用自攻钉固定;绑扎钢筋;依次安装华夫筒的底环、筒体和顶环并对安装完的华夫筒进行固定;在安装固定好的华夫筒筒体上安装固定华夫筒的盖板;安装华夫筒的校正拉杆,其中,拉杆与所述钢筋焊接固定;浇筑混凝土,将顶环和底环与混凝土浇筑形成一体,并在浇筑之后对华夫筒表面进行收光处理;对华夫筒进行涂装,拆除华夫筒,具体按盖板、筒体、底模的顺序拆除;能够解决华夫层结构施工困难、涂装材料耐候性差的问题。
Construction method of waffle plate layer structure
The invention provides a construction method of a waffle plate layer structure, and belongs to the technical field of building construction, the waffle plate layer construction slurry leakage prevention structure comprises a waffle cylinder, and the waffle cylinder comprises five parts including a cylinder body, a cover plate, a top ring, a base and a bottom ring; the construction method comprises the steps that a waffle plate floor formwork is laid; positioning and paying off the waffle cylinder; a base of the waffle cylinder is installed and fixed through self-tapping screws; binding reinforcing steel bars; a bottom ring, a cylinder body and a top ring of the waffle cylinder are sequentially installed, and the installed waffle cylinder is fixed; a cover plate for fixing the waffle cylinder is installed on the cylinder body of the waffle cylinder which is installed and fixed; a correction pull rod of the waffle cylinder is installed, and the pull rod and the steel bars are welded and fixed; concrete is poured, the top ring, the bottom ring and the concrete are poured into a whole, and after pouring, the surface of the waffle cylinder is subjected to light receiving treatment; the waffle cylinder is coated, the waffle cylinder is dismantled, and specifically, the cover plate, the cylinder body and the bottom die are dismantled in sequence; the problems that a waffle layer structure is difficult to construct and a coating material is poor in weather resistance can be solved.
本发明提供了一种华夫板层结构的施工方法,属于建筑施工技术领域,该华夫板层施工防漏浆结构及其施工方法包括华夫筒,所述华夫筒包括筒身、盖板、顶环、底座、底环五个部分构成;所述施工方法包括铺设华夫板楼面模板;华夫筒定位放线;安装华夫筒的底座并用自攻钉固定;绑扎钢筋;依次安装华夫筒的底环、筒体和顶环并对安装完的华夫筒进行固定;在安装固定好的华夫筒筒体上安装固定华夫筒的盖板;安装华夫筒的校正拉杆,其中,拉杆与所述钢筋焊接固定;浇筑混凝土,将顶环和底环与混凝土浇筑形成一体,并在浇筑之后对华夫筒表面进行收光处理;对华夫筒进行涂装,拆除华夫筒,具体按盖板、筒体、底模的顺序拆除;能够解决华夫层结构施工困难、涂装材料耐候性差的问题。
Construction method of waffle plate layer structure
一种华夫板层结构的施工方法
SHI HONGLIANG (Autor:in) / ZHAN YONGFANG (Autor:in) / XIAO YAO (Autor:in) / WANG YAOLONG (Autor:in) / HUANG SEN (Autor:in) / LI CHUNBO (Autor:in) / QI SHENG (Autor:in) / WU YUNSHENG (Autor:in) / QIU JIN (Autor:in) / YU FENGFENG (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B05D
PROCESSES FOR APPLYING LIQUIDS OR OTHER FLUENT MATERIALS TO SURFACES, IN GENERAL
,
Verfahren zum Aufbringen von Flüssigkeiten oder von anderen fließfähigen Stoffen auf Oberflächen allgemein
/
C09D
Überzugsmittel, z.B. Anstrichstoffe, Firnisse oder Lacke
,
COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS
Construction device and construction method for improving flatness of waffle plate
Europäisches Patentamt | 2024
|Waffle plate construction method using odd cylinder as hole reserving mold
Europäisches Patentamt | 2023
|Construction method of steel structure based on Waffle floor
Europäisches Patentamt | 2020
|