Fully-prefabricated staircase
The invention provides a fully-prefabricated staircase, and relates to the technical field of fabricated buildings, the fully-prefabricated staircase comprises a prefabricated rest platform, a prefabricated staircase section and a prefabricated staircase wall body; the prefabricated rest platform and the prefabricated stair flights are both formed by integral pouring; platform pre-embedded lifting nails are embedded in the prefabricated rest platform. The construction method has the advantages that mold sealing and pouring operation between prefabricated parts is avoided, procedures such as on-site mold erecting and pouring are reduced, on-site wet operation is reduced, construction operation efficiency is greatly improved, on-site safe and civilized construction is guaranteed, advantages and characteristics of fabricated buildings are brought into full play, and the assembly rate and standardization of the fabricated buildings are obviously improved; the problems that according to a common method of an existing assembly type building prefabricated stair, only a stair section part is prefabricated, a rest platform, a stair column, a stair beam and the like are still in a cast-in-place mode, and therefore the phenomena that embedded parts are staggered and deviation is too large frequently occur in the installation process of the prefabricated stair section are solved.
本发明提供一种全预制楼梯间,涉及装配式建筑技术领域,包括:预制休息平台、预制楼梯梯段、预制楼梯间墙体;所述预制休息平台与所述预制楼梯梯段均为整体浇筑制成;所述预制休息平台埋设有平台预埋起吊吊钉;避免了预制构件之间封模浇筑作业,减少了现场支模、浇筑等工序,通过减少现场湿作业,大大加快了施工作业效率,保证了现场安全文明施工,充分发挥了装配式建筑的优势特点,对装配式建筑的装配率和标准化有明显的提升作用,解决了现有装配式建筑预制楼梯常见做法为仅预制楼梯梯段部分,休息平台、梯柱、梯梁等仍采用现浇方式,从而预制楼梯梯段安装过程中经常出现预埋件错位、偏差过大的现象的问题。
Fully-prefabricated staircase
The invention provides a fully-prefabricated staircase, and relates to the technical field of fabricated buildings, the fully-prefabricated staircase comprises a prefabricated rest platform, a prefabricated staircase section and a prefabricated staircase wall body; the prefabricated rest platform and the prefabricated stair flights are both formed by integral pouring; platform pre-embedded lifting nails are embedded in the prefabricated rest platform. The construction method has the advantages that mold sealing and pouring operation between prefabricated parts is avoided, procedures such as on-site mold erecting and pouring are reduced, on-site wet operation is reduced, construction operation efficiency is greatly improved, on-site safe and civilized construction is guaranteed, advantages and characteristics of fabricated buildings are brought into full play, and the assembly rate and standardization of the fabricated buildings are obviously improved; the problems that according to a common method of an existing assembly type building prefabricated stair, only a stair section part is prefabricated, a rest platform, a stair column, a stair beam and the like are still in a cast-in-place mode, and therefore the phenomena that embedded parts are staggered and deviation is too large frequently occur in the installation process of the prefabricated stair section are solved.
本发明提供一种全预制楼梯间,涉及装配式建筑技术领域,包括:预制休息平台、预制楼梯梯段、预制楼梯间墙体;所述预制休息平台与所述预制楼梯梯段均为整体浇筑制成;所述预制休息平台埋设有平台预埋起吊吊钉;避免了预制构件之间封模浇筑作业,减少了现场支模、浇筑等工序,通过减少现场湿作业,大大加快了施工作业效率,保证了现场安全文明施工,充分发挥了装配式建筑的优势特点,对装配式建筑的装配率和标准化有明显的提升作用,解决了现有装配式建筑预制楼梯常见做法为仅预制楼梯梯段部分,休息平台、梯柱、梯梁等仍采用现浇方式,从而预制楼梯梯段安装过程中经常出现预埋件错位、偏差过大的现象的问题。
Fully-prefabricated staircase
全预制楼梯间
LIU EN (Autor:in) / XIE XIANG (Autor:in) / LI LIFENG (Autor:in) / XIAN BING (Autor:in) / ZHANG HEMIN (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch