Cast-in-place hollow thin-wall high pier combined stirrup installation method
The invention relates to a cast-in-place hollow thin-wall high pier combined type stirrup installation method which comprises the steps that an outer formwork and an inner formwork of a hollow thin-wall high pier are installed firstly, then main reinforcements are installed, combined type stirrup installation is conducted, and finally concrete pouring and section-by-section construction are conducted till construction of the whole hollow thin-wall high pier is completed. The combined stirrups which are assembled, bound and temporarily fixed on the jig frame are mounted to specified modules of the hollow thin-wall high pier through a crane, then the modules of the hollow thin-wall high pier are connected, and the purpose of quick and high-quality mounting of the stirrups of the thin-wall high pier is achieved in a building block building mode.
本发明涉及一种现浇空心薄壁高墩组合式箍筋安装方法,包括先安装空心薄壁高墩的外模板和内模板,再安装主筋和进行组合式箍筋安装,最后浇筑混凝土,逐段施工,直至整个心薄壁高墩完成施工。在胎架上拼装、绑扎、临时固定好的组合箍筋通过吊机安装至空心空心薄壁高墩指定模块,之后,对空心空心薄壁高墩各模块进行连接,通过“搭积木”的方式,达到薄壁高墩箍筋快速、高质量安装的目的。
Cast-in-place hollow thin-wall high pier combined stirrup installation method
The invention relates to a cast-in-place hollow thin-wall high pier combined type stirrup installation method which comprises the steps that an outer formwork and an inner formwork of a hollow thin-wall high pier are installed firstly, then main reinforcements are installed, combined type stirrup installation is conducted, and finally concrete pouring and section-by-section construction are conducted till construction of the whole hollow thin-wall high pier is completed. The combined stirrups which are assembled, bound and temporarily fixed on the jig frame are mounted to specified modules of the hollow thin-wall high pier through a crane, then the modules of the hollow thin-wall high pier are connected, and the purpose of quick and high-quality mounting of the stirrups of the thin-wall high pier is achieved in a building block building mode.
本发明涉及一种现浇空心薄壁高墩组合式箍筋安装方法,包括先安装空心薄壁高墩的外模板和内模板,再安装主筋和进行组合式箍筋安装,最后浇筑混凝土,逐段施工,直至整个心薄壁高墩完成施工。在胎架上拼装、绑扎、临时固定好的组合箍筋通过吊机安装至空心空心薄壁高墩指定模块,之后,对空心空心薄壁高墩各模块进行连接,通过“搭积木”的方式,达到薄壁高墩箍筋快速、高质量安装的目的。
Cast-in-place hollow thin-wall high pier combined stirrup installation method
一种现浇空心薄壁高墩组合式箍筋安装方法
CHANG ZHUGANG (Autor:in) / ZHANG HONGXIAN (Autor:in) / WANG LEI (Autor:in) / LUO XIAOGUANG (Autor:in) / XIE HAIBO (Autor:in) / YU PENG (Autor:in) / DENG HAIBO (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2023
|Novel prefabricated-cast-in-place combined reinforced concrete hollow pier and implementation method
Europäisches Patentamt | 2023
|Double-limb thin-wall pier cast-in-place beam bracket embedded part construction method
Europäisches Patentamt | 2023
|