The invention discloses a construction process of a steel-concrete combined fabricated wall. The construction process specifically comprises the following steps: (1) performing cast-in-place construction on a left wall column, a right wall column and a reinforced concrete floor slab; (2) wall body positioning grooves are prefabricated in the upper surface of the reinforced concrete floor slab; (3) the hoisting device is installed at the upper end of the left wall column and the upper end of the right wall column in a crossing mode; (4) the hoisting device is controlled to hoist the multiple steel-concrete combined pipes, and the steel-concrete combined pipes are in left-right butt joint to form the fabricated wall body erected between the left wall column and the right wall column; (5) the fabricated wall body, the left wall column and the right wall column are poured together; and (6) a left wall column, a right wall column and a reinforced concrete floor are poured and constructed on the upper layer, the steps (2)-(5) are repeated, and the upper-layer fabricated wall can be constructed. And (7) the construction steps are repeated, and construction of the whole wall can be completed. A tower crane does not need to be used for hoisting the steel-concrete combined pipe, the cost is greatly reduced, the construction efficiency is greatly improved, and the shear strength of the fabricated wall is greatly improved.
一种钢砼组合装配式墙体施工工艺,具体包括以下步骤:(1)、现场浇筑施工左墙柱、右墙柱和钢筋混凝土楼板;(2)、在钢筋混凝土楼板的上表面预制墙体定位槽;(3)、将吊装装置横跨安装在左墙柱和右墙柱的上端;(4)、操控吊装装置将若干个钢砼组合管吊起并左右对接成竖立在左墙柱和右墙柱之间的装配式墙体;(5)、将装配式墙体、左墙柱和右墙柱浇筑在一起;(6)、再在上层浇筑施工左墙柱、右墙柱和钢筋混凝土楼板,重复步骤(2)‑(5),即可施工完成上层装配式墙体;(7)、重复上述施工步骤,便可完成整个墙体的施工。本发明无需使用塔吊起吊钢砼组合管,成本大大降低,施工效率大大提高,还大大增加了装配式墙体的抗剪强度。
Construction process of steel-concrete combined fabricated wall
The invention discloses a construction process of a steel-concrete combined fabricated wall. The construction process specifically comprises the following steps: (1) performing cast-in-place construction on a left wall column, a right wall column and a reinforced concrete floor slab; (2) wall body positioning grooves are prefabricated in the upper surface of the reinforced concrete floor slab; (3) the hoisting device is installed at the upper end of the left wall column and the upper end of the right wall column in a crossing mode; (4) the hoisting device is controlled to hoist the multiple steel-concrete combined pipes, and the steel-concrete combined pipes are in left-right butt joint to form the fabricated wall body erected between the left wall column and the right wall column; (5) the fabricated wall body, the left wall column and the right wall column are poured together; and (6) a left wall column, a right wall column and a reinforced concrete floor are poured and constructed on the upper layer, the steps (2)-(5) are repeated, and the upper-layer fabricated wall can be constructed. And (7) the construction steps are repeated, and construction of the whole wall can be completed. A tower crane does not need to be used for hoisting the steel-concrete combined pipe, the cost is greatly reduced, the construction efficiency is greatly improved, and the shear strength of the fabricated wall is greatly improved.
一种钢砼组合装配式墙体施工工艺,具体包括以下步骤:(1)、现场浇筑施工左墙柱、右墙柱和钢筋混凝土楼板;(2)、在钢筋混凝土楼板的上表面预制墙体定位槽;(3)、将吊装装置横跨安装在左墙柱和右墙柱的上端;(4)、操控吊装装置将若干个钢砼组合管吊起并左右对接成竖立在左墙柱和右墙柱之间的装配式墙体;(5)、将装配式墙体、左墙柱和右墙柱浇筑在一起;(6)、再在上层浇筑施工左墙柱、右墙柱和钢筋混凝土楼板,重复步骤(2)‑(5),即可施工完成上层装配式墙体;(7)、重复上述施工步骤,便可完成整个墙体的施工。本发明无需使用塔吊起吊钢砼组合管,成本大大降低,施工效率大大提高,还大大增加了装配式墙体的抗剪强度。
Construction process of steel-concrete combined fabricated wall
一种钢砼组合装配式墙体施工工艺
GAO WEINAN (Autor:in) / YAO YINJUAN (Autor:in) / LI JUN (Autor:in) / CUI SIJUAN (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated buckling-restrained steel concrete composite shear wall and construction process thereof
Europäisches Patentamt | 2024
|Fabricated thin-wall concrete filled steel tube pier system and construction process thereof
Europäisches Patentamt | 2022
|Fabricated steel-concrete composite shear wall and construction method thereof
Europäisches Patentamt | 2021
|Fabricated concrete enclosing wall construction technology
Europäisches Patentamt | 2023
|