Construction method of independent post-dismantling supporting type formwork quick dismantling system
The invention discloses a construction method of an independent post-dismantled supporting type formwork quick dismantling system, which comprises the following steps of: pouring concrete on the top surfaces of a supporting unit formwork and an independent post-dismantled batten of the independent post-dismantled supporting type formwork quick dismantling system, firstly dismantling a vertical rod B and the independent post-dismantled batten when a floor slab is formed after the strength of the concrete is met, and then dismantling the vertical rod B and the independent post-dismantled batten; and the supporting unit formwork, the vertical rod A, the bracket A, the batten A and the transverse pipe are not disassembled, so that the vertical rod A, the bracket A, the batten A and the transverse pipe still support the floor through the supporting unit formwork, and the floor is maintained to the design strength in the later period. After the strength of concrete poured on the supporting unit formworks and the top faces of the independent post-dismantled battens is met, the vertical rods B and the independent post-dismantled battens are dismantled firstly, and effective turnover utilization of the vertical rods B and the independent post-dismantled battens can be achieved; the problem that effective turnover cannot be achieved due to the fact that quick-release system scaffold components in a continuous supporting state are detached after concrete reaches the design strength is solved.
本申请公开了一种独立后拆支撑式模板快拆体系施工方法,包括步骤为:在独立后拆支撑式模板快拆体系的支撑单元模板和独立后拆木方顶面上浇筑混凝土,待混凝土强度满足后构成楼板时,先拆除立杆B和独立后拆木方,不拆除支撑单元模板、立杆A、托座A、木方A、横管,使立杆A、托座A、木方A及横管依旧通过支撑单元模板支撑楼板,待楼板在后期养护至设计强度。待浇筑在支撑单元模板和独立后拆木方顶面的混凝土强度满足后,先对立杆B和独立后拆木方的拆除,能实现立杆B和独立后拆木方的有效周转利用,解决了混凝土达到设计强度后再拆除处于持续支撑的快拆体系脚手架构件存在不能得到有效周转的问题。
Construction method of independent post-dismantling supporting type formwork quick dismantling system
The invention discloses a construction method of an independent post-dismantled supporting type formwork quick dismantling system, which comprises the following steps of: pouring concrete on the top surfaces of a supporting unit formwork and an independent post-dismantled batten of the independent post-dismantled supporting type formwork quick dismantling system, firstly dismantling a vertical rod B and the independent post-dismantled batten when a floor slab is formed after the strength of the concrete is met, and then dismantling the vertical rod B and the independent post-dismantled batten; and the supporting unit formwork, the vertical rod A, the bracket A, the batten A and the transverse pipe are not disassembled, so that the vertical rod A, the bracket A, the batten A and the transverse pipe still support the floor through the supporting unit formwork, and the floor is maintained to the design strength in the later period. After the strength of concrete poured on the supporting unit formworks and the top faces of the independent post-dismantled battens is met, the vertical rods B and the independent post-dismantled battens are dismantled firstly, and effective turnover utilization of the vertical rods B and the independent post-dismantled battens can be achieved; the problem that effective turnover cannot be achieved due to the fact that quick-release system scaffold components in a continuous supporting state are detached after concrete reaches the design strength is solved.
本申请公开了一种独立后拆支撑式模板快拆体系施工方法,包括步骤为:在独立后拆支撑式模板快拆体系的支撑单元模板和独立后拆木方顶面上浇筑混凝土,待混凝土强度满足后构成楼板时,先拆除立杆B和独立后拆木方,不拆除支撑单元模板、立杆A、托座A、木方A、横管,使立杆A、托座A、木方A及横管依旧通过支撑单元模板支撑楼板,待楼板在后期养护至设计强度。待浇筑在支撑单元模板和独立后拆木方顶面的混凝土强度满足后,先对立杆B和独立后拆木方的拆除,能实现立杆B和独立后拆木方的有效周转利用,解决了混凝土达到设计强度后再拆除处于持续支撑的快拆体系脚手架构件存在不能得到有效周转的问题。
Construction method of independent post-dismantling supporting type formwork quick dismantling system
一种独立后拆支撑式模板快拆体系施工方法
LUO JINKE (Autor:in) / LI YINGZHANG (Autor:in) / CHEN ZILONG (Autor:in) / LI HUAIZHU (Autor:in) / PENG HUI (Autor:in) / WANG CHI (Autor:in) / LUO ZHENGQUAN (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Building construction formwork dismantling method and dismantling device
Europäisches Patentamt | 2023
|