Nuclear power plant building layout
The invention discloses a nuclear power plant building layout, and relates to the technical field of nuclear power plant buildings. The nuclear power plant building layout comprises a reactor building, a safety building partially or completely surrounding the periphery of the reactor building, and a high-energy pipeline group for transmission; the safety plant comprises a main control area and a mounting area, the center of the main control area is connected with the center of the reactor plant to form a first wiring line, and the center of the mounting area is connected with the center of the reactor plant to form a second wiring line; the high-energy pipeline group is introduced into the mounting area from the outer side of the safety plant, and is connected to the reactor plant along the first row of wires in the mounting area in a linear extension manner; when the first row of wires and the second row of wires are not overlapped, the main control area and the mounting area are positioned on the same side of the reactor building; or when the first row of wires and the second row of wires coincide with each other, the main control area and the installation area are located on the two opposite sides of the reactor building respectively. Therefore, the transportation distance and the occupied area of the high-energy pipeline group are shortened, and the construction cost is reduced.
本发明的核电厂房布局涉及核电厂房技术领域,该核电厂房布局包括反应堆厂房、部分或全部环绕反应堆厂房外周设置的安全厂房以及用于传输的高能管道组;安全厂房包括主控区及安装区,主控区的中心与反应堆厂房的中心连接形成第一排布线,安装区的中心与反应堆厂房的中心连接形成第二排布线;高能管道组于安全厂房外侧引入安装区内,并在安装区内沿第一排布线以直线延伸的方式连接至反应堆厂房;其中,第一排布线和第二排布线互不重合时,主控区和安装区位于反应堆厂房的同一侧;或第一排布线和第二排布线互相重合时,主控区和安装区分别位于反应堆厂房相对的两侧。如此,缩短了高能管道组的运输距离及占地面积,降低了建造成本。
Nuclear power plant building layout
The invention discloses a nuclear power plant building layout, and relates to the technical field of nuclear power plant buildings. The nuclear power plant building layout comprises a reactor building, a safety building partially or completely surrounding the periphery of the reactor building, and a high-energy pipeline group for transmission; the safety plant comprises a main control area and a mounting area, the center of the main control area is connected with the center of the reactor plant to form a first wiring line, and the center of the mounting area is connected with the center of the reactor plant to form a second wiring line; the high-energy pipeline group is introduced into the mounting area from the outer side of the safety plant, and is connected to the reactor plant along the first row of wires in the mounting area in a linear extension manner; when the first row of wires and the second row of wires are not overlapped, the main control area and the mounting area are positioned on the same side of the reactor building; or when the first row of wires and the second row of wires coincide with each other, the main control area and the installation area are located on the two opposite sides of the reactor building respectively. Therefore, the transportation distance and the occupied area of the high-energy pipeline group are shortened, and the construction cost is reduced.
本发明的核电厂房布局涉及核电厂房技术领域,该核电厂房布局包括反应堆厂房、部分或全部环绕反应堆厂房外周设置的安全厂房以及用于传输的高能管道组;安全厂房包括主控区及安装区,主控区的中心与反应堆厂房的中心连接形成第一排布线,安装区的中心与反应堆厂房的中心连接形成第二排布线;高能管道组于安全厂房外侧引入安装区内,并在安装区内沿第一排布线以直线延伸的方式连接至反应堆厂房;其中,第一排布线和第二排布线互不重合时,主控区和安装区位于反应堆厂房的同一侧;或第一排布线和第二排布线互相重合时,主控区和安装区分别位于反应堆厂房相对的两侧。如此,缩短了高能管道组的运输距离及占地面积,降低了建造成本。
Nuclear power plant building layout
核电厂房布局
CAO TAO (Autor:in) / HE WEITING (Autor:in) / LIU LIJUN (Autor:in) / PAN KEJUN (Autor:in) / DING NAN (Autor:in) / LI GUANGSHENG (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch