Bag brick, fabricated road and construction method of fabricated road
The invention belongs to the technical field of road construction, and discloses a bag brick which comprises a bag and filler filled in the bag, and the bag is a rectangular bag; lifting ropes are arranged in the bag bricks, the first ends of the lifting ropes are evenly connected to the inner bottom wall of the bag at intervals, and lifting holes are formed in the bag wall, opposite to the first ends of the lifting ropes, of the bag. The bag brick is further provided with a lifting ring which partially penetrates through the lifting hole to be connected with the second end of the lifting rope. Reinforcing belts are evenly arranged in the length direction of the bag at intervals and located on the outer wall, on one side of the lifting hole, of the bag. The fabricated road is formed by adjacently splicing a plurality of the bag bricks according to the construction method of the fabricated road, the bag bricks formed by the bags and the filler are high in strength and high in bearing capacity, the situation of concentrated deformation is not prone to occurring, uneven settlement is avoided, and the service life of the bag bricks is prolonged. Therefore, the cost and construction period demand of the temporary road can be quickly reduced.
本发明属于道路施工技术领域,公开了囊袋砖,包括囊袋以及填充于囊袋内部的填充物,囊袋为矩形囊袋;囊袋砖内设置有吊绳,吊绳的第一端均匀间隔连接于囊袋内底壁,与吊绳的第一端相对的囊袋的袋壁上设置有吊孔;囊袋砖还具有吊环,吊环部分穿过吊孔连接吊绳的第二端;沿囊袋的长度方向均匀间隔设置有加强带,加强带位于吊孔一侧的囊袋的外壁上。而装配式道路由若干上述的囊袋砖采用装配式道路的施工方法相邻拼接而成,采用上述的囊袋和填充物形成的囊袋砖,强度高,具有较强的承载性,而不易出现集中变形的情况,进而不会造成不均匀沉降,由此可以快速降低临时道路的成本和工期需求。
Bag brick, fabricated road and construction method of fabricated road
The invention belongs to the technical field of road construction, and discloses a bag brick which comprises a bag and filler filled in the bag, and the bag is a rectangular bag; lifting ropes are arranged in the bag bricks, the first ends of the lifting ropes are evenly connected to the inner bottom wall of the bag at intervals, and lifting holes are formed in the bag wall, opposite to the first ends of the lifting ropes, of the bag. The bag brick is further provided with a lifting ring which partially penetrates through the lifting hole to be connected with the second end of the lifting rope. Reinforcing belts are evenly arranged in the length direction of the bag at intervals and located on the outer wall, on one side of the lifting hole, of the bag. The fabricated road is formed by adjacently splicing a plurality of the bag bricks according to the construction method of the fabricated road, the bag bricks formed by the bags and the filler are high in strength and high in bearing capacity, the situation of concentrated deformation is not prone to occurring, uneven settlement is avoided, and the service life of the bag bricks is prolonged. Therefore, the cost and construction period demand of the temporary road can be quickly reduced.
本发明属于道路施工技术领域,公开了囊袋砖,包括囊袋以及填充于囊袋内部的填充物,囊袋为矩形囊袋;囊袋砖内设置有吊绳,吊绳的第一端均匀间隔连接于囊袋内底壁,与吊绳的第一端相对的囊袋的袋壁上设置有吊孔;囊袋砖还具有吊环,吊环部分穿过吊孔连接吊绳的第二端;沿囊袋的长度方向均匀间隔设置有加强带,加强带位于吊孔一侧的囊袋的外壁上。而装配式道路由若干上述的囊袋砖采用装配式道路的施工方法相邻拼接而成,采用上述的囊袋和填充物形成的囊袋砖,强度高,具有较强的承载性,而不易出现集中变形的情况,进而不会造成不均匀沉降,由此可以快速降低临时道路的成本和工期需求。
Bag brick, fabricated road and construction method of fabricated road
囊袋砖、装配式道路及其施工方法
YANG WENBO (Autor:in) / SU GUANGWEI (Autor:in) / CHEN HAO (Autor:in) / LONG YANWU (Autor:in) / CHEN ZIQI (Autor:in)
17.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Fabricated temporary construction road and construction method
Europäisches Patentamt | 2020
|Fabricated greening road and construction method thereof
Europäisches Patentamt | 2021
|