Mud jacking embedded pipe mounting process
The invention discloses a grouting embedded pipe mounting process, and belongs to the technical field of constructional engineering. The technology comprises the steps that a tensioning tool in a hole channel is detached, after the tensioning tool is detached, a grouting embedded pipe is installed in the hole channel, the grouting embedded pipe is adjusted to the side, close to the ground, of the hole channel and is tightly attached to the inner wall of the hole channel, and finally a grouting machine is installed at the other end of the embedded pipe. That is to say, the mud jacking embedded pipe is installed on the inner wall of the side, close to the ground, of the hole channel, the mud jacking in the hole channel is tamped from bottom to top, bubbles in the mud jacking are reduced, the strength of the mud jacking in the hole channel is improved, and the strength of the mud jacking in the hole channel meets the design strength.
本申请公开了一种压浆预埋管安装工艺,属于建筑工程技术领域。该工艺包括:先将孔道内的张拉工具进行拆下,待张拉工具拆卸完成后,在孔道内安装压浆预埋管,将所述压浆预埋管调整至所述孔道靠近地面侧,且紧贴所述孔道的内壁,最后将压浆机安装在预埋管的另一端。也就是说,通过将安装压浆预埋管安装在孔道靠近地面侧的内壁上,使孔道内的压浆自下而上进行填实减少压浆中的气泡,进而增加孔道内压浆的强度,使孔道内压浆的强度满足设计强度。
Mud jacking embedded pipe mounting process
The invention discloses a grouting embedded pipe mounting process, and belongs to the technical field of constructional engineering. The technology comprises the steps that a tensioning tool in a hole channel is detached, after the tensioning tool is detached, a grouting embedded pipe is installed in the hole channel, the grouting embedded pipe is adjusted to the side, close to the ground, of the hole channel and is tightly attached to the inner wall of the hole channel, and finally a grouting machine is installed at the other end of the embedded pipe. That is to say, the mud jacking embedded pipe is installed on the inner wall of the side, close to the ground, of the hole channel, the mud jacking in the hole channel is tamped from bottom to top, bubbles in the mud jacking are reduced, the strength of the mud jacking in the hole channel is improved, and the strength of the mud jacking in the hole channel meets the design strength.
本申请公开了一种压浆预埋管安装工艺,属于建筑工程技术领域。该工艺包括:先将孔道内的张拉工具进行拆下,待张拉工具拆卸完成后,在孔道内安装压浆预埋管,将所述压浆预埋管调整至所述孔道靠近地面侧,且紧贴所述孔道的内壁,最后将压浆机安装在预埋管的另一端。也就是说,通过将安装压浆预埋管安装在孔道靠近地面侧的内壁上,使孔道内的压浆自下而上进行填实减少压浆中的气泡,进而增加孔道内压浆的强度,使孔道内压浆的强度满足设计强度。
Mud jacking embedded pipe mounting process
压浆预埋管安装工艺
ZHONG WEILING (Autor:in) / WANG FENG (Autor:in) / YOU NAN (Autor:in) / DING DAYOU (Autor:in) / ZHAO HAIQING (Autor:in) / WANG CHAO (Autor:in) / LIU BO (Autor:in) / WANG YONGLI (Autor:in) / JIANG ZIQI (Autor:in)
28.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Pipe jacking device and pipe jacking construction process
Europäisches Patentamt | 2020
|Bidirectional-jacking pipe jacking construction system and construction process
Europäisches Patentamt | 2021
|Online Contents | 1994