Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Green building heat preservation and pouring integrated structure and pouring method thereof
The invention discloses a green building heat preservation and pouring integrated structure and a pouring method thereof.The green building heat preservation and pouring integrated structure comprises a base and a heat preservation plate main body, first steel bar main bodies are vertically installed in the base, second steel bar main bodies are arranged on the outer walls of the first steel bar main bodies, and clamping grooves are formed in the outer walls of the second steel bar main bodies; a fifth steel bar main body is transversely arranged on the outer wall of the first steel bar main body, a heat preservation plate main body is installed at the top end of the base, a fixing rod is arranged in the heat preservation plate main body, a first formwork is installed at the top end of the base, and a second formwork is installed at the end, away from the first formwork, of the top end of the base. The threaded sleeves are rotated to drive the fixing pieces to extrude the heat preservation plate body for fixed installation, the situation that the heat preservation plate body is not fixed firmly is avoided, meanwhile, the third steel bar body and the fourth steel bar body penetrate through the arc-shaped grooves correspondingly and are fixed to the fixing pieces, and therefore the heat preservation plate body is fixed more firmly.
本发明公开了一种绿色建筑保温浇筑一体化结构及其浇筑方法,包括基座和保温板主体,所述基座的内部皆竖直安装有第一钢筋主体,所述第一钢筋主体的外壁设置有第二钢筋主体,且第二钢筋主体的外壁皆开设有卡槽,所述第一钢筋主体的外壁横向设置有第五钢筋主体,所述基座的顶端安装有保温板主体,且保温板主体的内部设置有固定杆,所述基座的顶端安装有第一模板,所述基座顶端远离第一模板的一端安装有第二模板。本发明通过转动螺纹套筒来带动固定件挤压保温板主体来进行固定安装,避免保温板主体固定不牢固,同时通过第三钢筋主体和第四钢筋主体分别贯穿弧形槽并与固定件相固定,从而使保温板主体固定更为牢固。
Green building heat preservation and pouring integrated structure and pouring method thereof
The invention discloses a green building heat preservation and pouring integrated structure and a pouring method thereof.The green building heat preservation and pouring integrated structure comprises a base and a heat preservation plate main body, first steel bar main bodies are vertically installed in the base, second steel bar main bodies are arranged on the outer walls of the first steel bar main bodies, and clamping grooves are formed in the outer walls of the second steel bar main bodies; a fifth steel bar main body is transversely arranged on the outer wall of the first steel bar main body, a heat preservation plate main body is installed at the top end of the base, a fixing rod is arranged in the heat preservation plate main body, a first formwork is installed at the top end of the base, and a second formwork is installed at the end, away from the first formwork, of the top end of the base. The threaded sleeves are rotated to drive the fixing pieces to extrude the heat preservation plate body for fixed installation, the situation that the heat preservation plate body is not fixed firmly is avoided, meanwhile, the third steel bar body and the fourth steel bar body penetrate through the arc-shaped grooves correspondingly and are fixed to the fixing pieces, and therefore the heat preservation plate body is fixed more firmly.
本发明公开了一种绿色建筑保温浇筑一体化结构及其浇筑方法,包括基座和保温板主体,所述基座的内部皆竖直安装有第一钢筋主体,所述第一钢筋主体的外壁设置有第二钢筋主体,且第二钢筋主体的外壁皆开设有卡槽,所述第一钢筋主体的外壁横向设置有第五钢筋主体,所述基座的顶端安装有保温板主体,且保温板主体的内部设置有固定杆,所述基座的顶端安装有第一模板,所述基座顶端远离第一模板的一端安装有第二模板。本发明通过转动螺纹套筒来带动固定件挤压保温板主体来进行固定安装,避免保温板主体固定不牢固,同时通过第三钢筋主体和第四钢筋主体分别贯穿弧形槽并与固定件相固定,从而使保温板主体固定更为牢固。
Green building heat preservation and pouring integrated structure and pouring method thereof
一种绿色建筑保温浇筑一体化结构及其浇筑方法
LI CHANGYI (Autor:in) / TAKAMATSU TATSUKI (Autor:in)
28.03.2023
Patent
Elektronische Ressource
Chinesisch
Building wall pouring device and pouring method thereof
Europäisches Patentamt | 2023
|Heat preservation non-dismantling formwork for building pouring
Europäisches Patentamt | 2023
|Pouring device for house building construction and pouring method thereof
Europäisches Patentamt | 2024
|Construction method for improving heat preservation integrated pouring quality
Europäisches Patentamt | 2024
|Secondary structure pouring device and pouring method thereof
Europäisches Patentamt | 2024
|