The invention discloses a construction method for a denitrification biological filter, which comprises the following steps: according to the boundary dimension of the biological filter, assembling a building template and laying reinforcing steel bars; stirring concrete and pouring a tank body of the biological filter tank; after the building formwork is demolded, the concrete and the pool body are cured; a formwork of the supporting base is assembled, and reinforcing steel bars are laid; concrete is stirred, and a supporting base is poured; the formwork of the supporting base is removed, and the supporting base is maintained; water inlet pipes are mounted on two sides of the bottom of the biological filter; an exhaust pipe is installed and fixed, filter bricks are installed on a bottom step of the supporting base, and the bottom of the pool is paved with the filter bricks; hoisting a filler box into the pool, and placing the filler box on the top of the supporting base; the invention relates to the technical field of filter construction. According to the construction method for the denitrification biological filter tank, the problem of high construction cost caused by large wall thickness of an existing ground concrete filter tank is solved, and the construction cost is reduced.
本发明公开了一种用于反硝化生物滤池的施工方法,包括以下步骤:根据生物滤池的外形尺寸,组装建筑模板并铺设钢筋;搅拌混凝土浇筑生物滤池的池体;将建筑模板脱模后对混凝土对池体进行养护;组装支撑底座的模板并铺设钢筋;搅拌混凝土并浇筑支撑底座;对支撑底座的模板进行拆除并对支撑底座进行养护;在生物滤池的池底两侧安装进水管;安装排气管并固定,在支撑底座的底层台阶上安装滤砖,将滤砖铺满池底;将填料箱吊装入池内,并放在支撑底座的顶部;本发明涉及滤池施工技术领域。该种用于反硝化生物滤池的施工方法,解决了现有的地面混凝土滤池壁厚大造成建造成本大的问题,降低了建造的成本。
The invention discloses a construction method for a denitrification biological filter, which comprises the following steps: according to the boundary dimension of the biological filter, assembling a building template and laying reinforcing steel bars; stirring concrete and pouring a tank body of the biological filter tank; after the building formwork is demolded, the concrete and the pool body are cured; a formwork of the supporting base is assembled, and reinforcing steel bars are laid; concrete is stirred, and a supporting base is poured; the formwork of the supporting base is removed, and the supporting base is maintained; water inlet pipes are mounted on two sides of the bottom of the biological filter; an exhaust pipe is installed and fixed, filter bricks are installed on a bottom step of the supporting base, and the bottom of the pool is paved with the filter bricks; hoisting a filler box into the pool, and placing the filler box on the top of the supporting base; the invention relates to the technical field of filter construction. According to the construction method for the denitrification biological filter tank, the problem of high construction cost caused by large wall thickness of an existing ground concrete filter tank is solved, and the construction cost is reduced.
本发明公开了一种用于反硝化生物滤池的施工方法,包括以下步骤:根据生物滤池的外形尺寸,组装建筑模板并铺设钢筋;搅拌混凝土浇筑生物滤池的池体;将建筑模板脱模后对混凝土对池体进行养护;组装支撑底座的模板并铺设钢筋;搅拌混凝土并浇筑支撑底座;对支撑底座的模板进行拆除并对支撑底座进行养护;在生物滤池的池底两侧安装进水管;安装排气管并固定,在支撑底座的底层台阶上安装滤砖,将滤砖铺满池底;将填料箱吊装入池内,并放在支撑底座的顶部;本发明涉及滤池施工技术领域。该种用于反硝化生物滤池的施工方法,解决了现有的地面混凝土滤池壁厚大造成建造成本大的问题,降低了建造的成本。
Construction method for denitrification biological filter
一种用于反硝化生物滤池的施工方法
28.03.2023
Patent
Elektronische Ressource
Chinesisch
Denitrification filter tank integrally-formed filter plate construction method and filter plate
Europäisches Patentamt | 2024
|Construction method of regenerated filter bricks for denitrification deep-bed filter
Europäisches Patentamt | 2021
|Sewage Treatment of Post-Denitrification Oxic/Anoxic Biological Filter
British Library Conference Proceedings | 2011
|Nitrification and Denitrification in a Biological Aerated/Anoxic Filter Pilot Plant
British Library Conference Proceedings | 1996
|