Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for updating steel rails of railway track by using new long steel rails and related work train
A method for renewing old rails (21) of a railway track (20) is disclosed in which, during a first phase (A), new long rails (22) are unloaded along the railway track (20) from a group of transport carriages (120) of a work train (100) traveling in a first direction of travel (F1) and, during a second phase (B), the work train travels in a second direction of travel (F2) opposite the first direction of travel (F1), the new long rail (22) is placed during the second phase (B) and then fastened to the fastening structure (23) of the railway track (20); and a work train designed to carry out the method for renewing old rails (21).
公开了一种用于更新铁路轨道(20)的旧钢轨(21)的方法,其中在第一阶段(A)期间,沿着铁路轨道(20)从沿第一行进方向(F1)行进的作业列车(100)的一组运输车厢(120)上卸载新的长钢轨(22)以及,在第二阶段(B)期间,作业列车在与第一行进方向(F1)相反的第二行进方向(F2)上行进,新的长钢轨(22)在第二阶段(B)期间被放置随后固定在铁路轨道(20)的固定结构(23)上;以及一种设计成实施用于更新旧钢轨(21)的方法的作业列车。
Method for updating steel rails of railway track by using new long steel rails and related work train
A method for renewing old rails (21) of a railway track (20) is disclosed in which, during a first phase (A), new long rails (22) are unloaded along the railway track (20) from a group of transport carriages (120) of a work train (100) traveling in a first direction of travel (F1) and, during a second phase (B), the work train travels in a second direction of travel (F2) opposite the first direction of travel (F1), the new long rail (22) is placed during the second phase (B) and then fastened to the fastening structure (23) of the railway track (20); and a work train designed to carry out the method for renewing old rails (21).
公开了一种用于更新铁路轨道(20)的旧钢轨(21)的方法,其中在第一阶段(A)期间,沿着铁路轨道(20)从沿第一行进方向(F1)行进的作业列车(100)的一组运输车厢(120)上卸载新的长钢轨(22)以及,在第二阶段(B)期间,作业列车在与第一行进方向(F1)相反的第二行进方向(F2)上行进,新的长钢轨(22)在第二阶段(B)期间被放置随后固定在铁路轨道(20)的固定结构(23)上;以及一种设计成实施用于更新旧钢轨(21)的方法的作业列车。
Method for updating steel rails of railway track by using new long steel rails and related work train
用新的长钢轨更新铁路轨道的钢轨的方法及相关作业列车
PILLET MICHEL (Autor:in) / PILLAI JONATHAN (Autor:in) / SAFUA MARIE-ANNE (Autor:in) / STUPAR MILAN (Autor:in) / MUNDT ALICE (Autor:in)
28.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Method for renewing rails of a railway track with new long rails, and associated work train
Europäisches Patentamt | 2023
|METHOD FOR RENEWING RAILS OF A RAILWAY TRACK WITH NEW LONG RAILS, AND ASSOCIATED WORK TRAIN
Europäisches Patentamt | 2023
|Engineering Index Backfile | 1934
|