Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integral lifting device for steel bridge under complex hydrogeological conditions
The invention relates to a steel bridge lifting device, in particular to a steel bridge integral lifting device under complex hydrogeological conditions, which comprises a lifting device body, the lifting device body comprises a lifting device, the bottom of the lifting device is provided with a lifting device base, and the surface of the lifting device base is provided with a fixing hole and an insertion hole. And a clamping device and a fourth fixing bolt are arranged at the top of the lifting device base. The lifting device has the advantages that the lifting device, the lifting device base, the fixing pile, the supporting table, the fixing column, the clamping groove, I-shaped steel, a connecting plate, a first fixing bolt, a second fixing bolt, a fixing ring, a clamping ring, a connecting plate, a third fixing bolt, a mounting plate, a fixing hole, an inserting hole and a fourth fixing bolt are matched; and the lifting device body can more stably integrate the steel bridge under complex hydrogeological conditions, so that the safety of the lifting device body is greatly improved.
本发明涉及钢桥梁提升装置,具体为一种复杂水文地质条件下钢桥梁整体提升装置,包括提升装置本体,所述提升装置本体包括提升装置,所述提升装置的底部设置有提升装置底座,所述提升装置底座的表面设置有固定孔和插孔,所述提升装置底座的顶部设置有卡接装置和第四固定螺栓。本发明的优点在于:通过提升装置、提升装置底座、固定桩、支撑台、固定柱和卡接槽、工字钢、连板、第一固定螺栓和第二固定螺栓、固定环、卡接环、连接板、第三固定螺栓和安装板、固定孔、插孔和第四固定螺栓之间的配合,能够使得提升装置本体在复杂的水文地质的条件下能够更加稳定的对钢桥梁进行整体,从而大大增加了提升装置本体的安全性。
Integral lifting device for steel bridge under complex hydrogeological conditions
The invention relates to a steel bridge lifting device, in particular to a steel bridge integral lifting device under complex hydrogeological conditions, which comprises a lifting device body, the lifting device body comprises a lifting device, the bottom of the lifting device is provided with a lifting device base, and the surface of the lifting device base is provided with a fixing hole and an insertion hole. And a clamping device and a fourth fixing bolt are arranged at the top of the lifting device base. The lifting device has the advantages that the lifting device, the lifting device base, the fixing pile, the supporting table, the fixing column, the clamping groove, I-shaped steel, a connecting plate, a first fixing bolt, a second fixing bolt, a fixing ring, a clamping ring, a connecting plate, a third fixing bolt, a mounting plate, a fixing hole, an inserting hole and a fourth fixing bolt are matched; and the lifting device body can more stably integrate the steel bridge under complex hydrogeological conditions, so that the safety of the lifting device body is greatly improved.
本发明涉及钢桥梁提升装置,具体为一种复杂水文地质条件下钢桥梁整体提升装置,包括提升装置本体,所述提升装置本体包括提升装置,所述提升装置的底部设置有提升装置底座,所述提升装置底座的表面设置有固定孔和插孔,所述提升装置底座的顶部设置有卡接装置和第四固定螺栓。本发明的优点在于:通过提升装置、提升装置底座、固定桩、支撑台、固定柱和卡接槽、工字钢、连板、第一固定螺栓和第二固定螺栓、固定环、卡接环、连接板、第三固定螺栓和安装板、固定孔、插孔和第四固定螺栓之间的配合,能够使得提升装置本体在复杂的水文地质的条件下能够更加稳定的对钢桥梁进行整体,从而大大增加了提升装置本体的安全性。
Integral lifting device for steel bridge under complex hydrogeological conditions
一种复杂水文地质条件下钢桥梁整体提升装置
DU JINJUAN (Autor:in) / GUAN JIAWEN (Autor:in) / DING TONGYONG (Autor:in) / YU DUAN (Autor:in) / GONG LINGYU (Autor:in) / LIU XINGYU (Autor:in)
31.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2021
|Integral lifting process for urban viaduct under complex conditions
Europäisches Patentamt | 2024
|Research on Integral Lifting Continuous Steel Box Girder Bridge Construction Technology
Trans Tech Publications | 2012
|Europäisches Patentamt | 2020
|