Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dam breach plugging disposal method and device
The invention discloses a dike breach plugging disposal method and device, the device comprises an upper cover body and a lower cover body, the upper cover body is composed of an upper steel hoop, a connecting hoop, an end block and a nylon woven mesh, the lower cover body is composed of a lower steel hoop, a connecting hoop, an end block and a nylon woven mesh, and the two cover bodies can be filled with plugging counterweights and assembled together. The connecting hoop and the upper steel hoop are fixed in a welded mode, the connecting hoop and the lower steel hoop are fixed in a welded mode, the connecting hoop and the end block are fixed in a welded mode, the nylon woven mesh is installed between the connecting hoop and the end block, and an assembly structure is arranged between the upper steel hoop and the lower steel hoop. Through the arranged assembling structure, the upper steel hoop and the lower steel hoop can be rapidly assembled and connected, the assembling convenience of the blocking disposal device is greatly improved, an operator can rapidly complete assembling of the device in a breach site, and the blocking disposal efficiency of the breach is improved to a certain degree.
本发明公开了一种堤坝决口封堵处置方法以及装置,包括上罩体和下罩体,所述上罩体由上钢箍、连接箍、端块和尼龙编织网组成,所述下罩体由下钢箍、连接箍、端块和尼龙编织网组成,两个罩体内部可填充封堵配重物,并组装在一起,所述连接箍与上钢箍之间以及连接箍与下钢箍之间均采用焊接固定,所述连接箍与端块焊接固定,所述尼龙编织网安装在连接箍和端块之间,所述上钢箍和下钢箍之间设有组装结构;通过设置的组装结构,使得上钢箍和下钢箍之间可以快速的完成组装连接,大幅度提高了封堵处置装置的组装便捷性,使得操作人员在决口现场可快速的完成装置的组装,一定程度的提高了决口的封堵处置效率。
Dam breach plugging disposal method and device
The invention discloses a dike breach plugging disposal method and device, the device comprises an upper cover body and a lower cover body, the upper cover body is composed of an upper steel hoop, a connecting hoop, an end block and a nylon woven mesh, the lower cover body is composed of a lower steel hoop, a connecting hoop, an end block and a nylon woven mesh, and the two cover bodies can be filled with plugging counterweights and assembled together. The connecting hoop and the upper steel hoop are fixed in a welded mode, the connecting hoop and the lower steel hoop are fixed in a welded mode, the connecting hoop and the end block are fixed in a welded mode, the nylon woven mesh is installed between the connecting hoop and the end block, and an assembly structure is arranged between the upper steel hoop and the lower steel hoop. Through the arranged assembling structure, the upper steel hoop and the lower steel hoop can be rapidly assembled and connected, the assembling convenience of the blocking disposal device is greatly improved, an operator can rapidly complete assembling of the device in a breach site, and the blocking disposal efficiency of the breach is improved to a certain degree.
本发明公开了一种堤坝决口封堵处置方法以及装置,包括上罩体和下罩体,所述上罩体由上钢箍、连接箍、端块和尼龙编织网组成,所述下罩体由下钢箍、连接箍、端块和尼龙编织网组成,两个罩体内部可填充封堵配重物,并组装在一起,所述连接箍与上钢箍之间以及连接箍与下钢箍之间均采用焊接固定,所述连接箍与端块焊接固定,所述尼龙编织网安装在连接箍和端块之间,所述上钢箍和下钢箍之间设有组装结构;通过设置的组装结构,使得上钢箍和下钢箍之间可以快速的完成组装连接,大幅度提高了封堵处置装置的组装便捷性,使得操作人员在决口现场可快速的完成装置的组装,一定程度的提高了决口的封堵处置效率。
Dam breach plugging disposal method and device
一种堤坝决口封堵处置方法以及装置
LI HONGJUN (Autor:in) / TANG JINGHUA (Autor:in) / HE NINGBO (Autor:in) / HE GUOFENG (Autor:in) / XIONG ZHONGXIANG (Autor:in) / ZHOU YI (Autor:in) / YANG MINGMING (Autor:in)
31.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Dike breach flexible plugging facility and plugging method
Europäisches Patentamt | 2024
|Quick plugging device and plugging method for water conservancy dike breach
Europäisches Patentamt | 2023
|